Skip to content

SM City Grand Central

A major SM Supermall in Caloocan, Metro Manila, Philippines, built on the former site of Ever Gotesco Grand Central.

Last updated August 24, 2026

AI crawler reads

1requests

1companies
  • Amazon1
Profile
1
Controversies
0
JSON · MD
0
First read
Nov 3, 2026
Latest read
Nov 3, 2026

Since Oct 28, 2026 · from this site's server log

Overview

SM City Grand Central is a large shopping mall in Caloocan, Metro Manila, Philippines, owned and operated by SM Prime Holdings. Located along Rizal Avenue Extension and directly connected to the Monumento station of the Manila Light Rail Transit System, the mall serves as a retail, dining, entertainment, and transport-linked commercial destination for northern Metro Manila. It is the second SM Supermall in Caloocan and the 77th SM Supermall overall. The property occupies the former site of Ever Gotesco Grand Central, a shopping center that operated from August 9, 1988 until a major fire destroyed the building on March 17, 2012. The damaged structure was subsequently demolished between 2012 and 2013. In 2015, SM Prime Holdings acquired the rights to redevelop the site and announced the SM City Grand Central identity. The replacement complex opened to the public on November 26, 2021, converting a long-vacant and historically important retail site into a modern SM shopping center. The completed mall has approximately 102,790 square meters of floor area across six floors. Its tenant and service mix includes SM Store, SM Supermarket, Ace Hardware, Our Home, Watsons, Surplus, Sports Central, Pet Express, Miniso, restaurants, and other retail and service operators. Entertainment facilities include four cinemas, two Director's Club cinemas, and Cyberzone, an area oriented toward consumer electronics, technology, and related services. The complex also contains Skylight Park, an indoor garden feature, and the Chapel of Our Lady of the Most Holy Rosary, a Roman Catholic chapel. Transportation access is a central part of the mall's role. Its direct connection to Monumento LRT station integrates the property with a major public-transport interchange and supports high-frequency access from Caloocan and surrounding districts. The mall provides parking for approximately 700 cars, complementing its rail connection. As an SM Supermall, it follows SM Prime's broad-format approach of combining department-store retail, grocery shopping, specialty stores, food and beverage, cinemas, leisure facilities, and community-oriented services in one destination. SM City Grand Central is also part of SM Prime's expansion through redevelopment and acquisition of established mall sites. It represents the company's third acquisition from Ever Gotesco Malls, following the acquisition of Ever Gotesco Ortigas, later reopened as SM City East Ortigas, and the standalone mall near the Monumento roundabout, which became SM Hypermarket Monumento. The project therefore links the history of a former independent shopping-center operator with the modern national SM Supermall network.

History

The site now occupied by SM City Grand Central has a long history as a retail destination in Caloocan. The original complex was Ever Gotesco Grand Central, which opened on August 9, 1988. It operated as part of Ever Gotesco Malls and became associated with the Monumento area and its surrounding transport and commercial activity. On March 17, 2012, the Ever Gotesco Grand Central building was destroyed by fire. The remains were eventually removed, with final demolition taking place from 2012 to 2013. The loss left a prominent commercial site available for redevelopment, while the location retained strategic value because of its position along Rizal Avenue Extension and its proximity to the Monumento transport hub. In 2015, SM Prime Holdings obtained the rights to renovate and redevelop the property. The project was named SM City Grand Central and became part of SM Prime's broader program of expanding the SM Supermall network through new construction, redevelopment, and acquisitions of existing commercial properties. The site was the third former Ever Gotesco Malls property acquired by SM Prime. Earlier transactions included Ever Gotesco Ortigas, which reopened as SM City East Ortigas, and the standalone mall near the Monumento roundabout, which became SM Hypermarket Monumento. The replacement mall was constructed as a six-floor complex with approximately 102,790 square meters of floor area. It opened to the public on November 26, 2021. Its format follows the established SM Supermall model, bringing together an SM department store, supermarket, specialty retailers, restaurants, entertainment, technology retail, and everyday services. The mall also includes four cinemas, two Director's Club cinemas, Cyberzone, an indoor garden called Skylight Park, and the Chapel of Our Lady of the Most Holy Rosary. Transport integration is one of the property's defining characteristics. SM City Grand Central is directly linked to Monumento LRT station, giving shoppers and workers a rail-connected route into the complex. It also offers parking for approximately 700 cars. With its combination of retail anchors, entertainment, public-access spaces, and transport connectivity, the mall functions both as a conventional shopping center and as a major commercial node in northern Metro Manila. It is identified as the second SM Supermall in Caloocan and the 77th in the wider SM Supermall portfolio.

  • 2021

    SM City Grand Central opens

    [1]

    The newly built shopping mall opened to the public on November 26, 2021.

  • 2015

    SM Prime obtains redevelopment rights

    [1]

    SM Prime Holdings acquired the rights to renovate the former mall site and announced the SM City Grand Central identity.

  • 2013

    Demolition of the former structure is completed

    [1]

    The remains of the former mall were demolished during the period from 2012 to 2013.

  • 2012

    Fire destroys the original mall

    [1]

    A major fire on March 17, 2012 destroyed the Ever Gotesco Grand Central building.

  • 1988

    Ever Gotesco Grand Central opens

    [1]

    The original shopping mall on the site opened as Ever Gotesco Grand Central on August 9, 1988.

Products and positioning

A large, transit-connected regional shopping mall combining department-store and grocery anchors with specialty retail, dining, cinemas, technology stores, indoor public-oriented spaces, and community services.

  • Department store

    SM Store

    The SM Store serves as a principal general-merchandise anchor, offering apparel, household goods, personal items, and other department-store categories within the mall.

  • Grocery retail

    SM Supermarket

    SM Supermarket provides grocery and everyday-consumption merchandise, giving the complex a regular-needs retail anchor in addition to its department-store and specialty-shopping offer.

  • Entertainment · 2021

    Cinema complex

    The mall includes four cinemas and two Director's Club cinemas, providing standard and premium movie-going formats as part of its entertainment offer.

  • Consumer electronics retail · 2021

    Cyberzone

    Cyberzone is the mall's technology-focused retail area, bringing together stores and services related to consumer electronics, communications, computers, and other digital products.

  • Indoor public space · 2021

    Skylight Park

    Skylight Park is an indoor garden feature designed to add an open, landscaped, and community-oriented space within the six-floor commercial complex.

Brand decisions

  • 2021

    Launch of the rebuilt SM City Grand CentralProduct launch

    Background

    The new mall was developed to replace the former shopping center on the site and to serve a dense, transit-connected area of northern Metro Manila.

    Action taken

    SM Prime Holdings opened the rebuilt complex to the public on November 26, 2021, with retail anchors, restaurants, cinemas, technology stores, indoor public space, and community facilities.

    Aftermath

    The property became the second SM Supermall in Caloocan and the 77th SM Supermall overall.

  • 2015

    Redevelopment of the former Ever Gotesco siteStrategy

    Background

    The former Ever Gotesco Grand Central building had been destroyed by fire and demolished, leaving a strategically located commercial site near Monumento available for a new development.

    Action taken

    SM Prime Holdings acquired the rights to renovate and redevelop the property under the SM City Grand Central name.

    Aftermath

    The redevelopment produced a new six-floor SM Supermall that opened in 2021 and expanded SM Prime's presence in Caloocan.

Sources1 sources

Cite this profile: Cite the canonical profile. /brand-wiki/sm-city-grand-central · Editorial policy · How profiles are compiled