Skip to content

Plaza Singapura

A long-established multi-level shopping mall on Singapore's Orchard Road, directly connected to Dhoby Ghaut MRT station.

Last updated August 22, 2026

AI crawler reads

No AI crawler has read this profile since Oct 28, 2026.

Overview

Plaza Singapura is a major shopping centre on Orchard Road in Singapore, positioned beside and directly linked to Dhoby Ghaut MRT station. It is one of the oldest continuously operating malls on the Orchard Road retail corridor and is managed by CapitaLand, with ownership associated with CapitaMall Trust. The centre serves a broad mass-market and lifestyle audience, particularly families, teenagers and young adults, through a combination of fashion, beauty, household goods, specialty retail, food and beverage, entertainment and services. The mall opened in stages in 1974. Yaohan's supermarket began operating in October of that year, followed by the department store's opening on 1 November. Plaza Singapura was formally opened in August 1975 by Singapore's then Minister for Finance, Hon Sui Sen. The original Yaohan presence was central to the mall's early identity, reflecting the department-store and supermarket-led format common to Singapore's first generation of modern shopping centres. Plaza Singapura has been repeatedly adapted as Singapore's retail environment changed. During 2002 and 2003, the mall was renovated and received a direct connection to Dhoby Ghaut MRT station. Improvements included work in the basement areas and the installation of travelators serving Basement 2, Basement 1 and Level 1. A further 2008 refresh gave Level 7 a stronger focus on toys, gifts, hobbies, anime and cosplay-related merchandise, helping the centre appeal to younger and enthusiast-oriented shoppers. The most significant transformation took place from 2012 into 2013. A redevelopment costing approximately S$150 million added a new retail wing and converted parts of the former Atrium@Orchard office area into shop space. The departure of Carrefour in September 2012 allowed the former supermarket footprint to be reconfigured, with Cold Storage taking space at Basement 2 and John Little occupying Level 1. The project expanded retail floor area by approximately 25 percent, from about 497,575 square feet to 629,000 square feet, and added roughly 80 retail and food-and-beverage units. The external redesign introduced a wave-like frontage extending approximately 170 metres, together with the multicoloured Jelly Baby Family sculptures by Italian artist Mauro Peruchetti. The tenant mix has continued to evolve. Long-running or prominent tenants have included Daiso, Cotton On and Uniqlo, while the mall has also hosted Japanese, Chinese, Thai, Vietnamese, Italian, American and halal-certified food concepts. Times Bookstore closed in February 2024 and was replaced by The Travel Store. A former department-store or fashion footprint that was used by Urban Revivo from 2017 to 2023 was subsequently taken over by Muji. Interior upgrading works in 2015 improved floor finishes, corridor lighting, toilets and lift lobbies, and added nursing rooms. A further phased redevelopment is planned from the third quarter of 2026 through the fourth quarter of 2028. The stated direction is to strengthen the mall's relationship with surrounding green spaces while keeping the centre open during the works. Golden Village cinema is scheduled to close permanently in August 2026. Plaza Singapura therefore remains an operating retail landmark whose identity combines historical continuity with periodic redevelopment and tenant repositioning.

History

Plaza Singapura emerged during the development of Singapore's Orchard Road retail corridor in the 1970s. Its first major trading activity came from Yaohan: the supermarket at Basement 1 opened in October 1974, while the department store opened on 1 November. The department store was inaugurated by Runme Shaw, then chairman of the Singapore Tourist Promotion Board. Plaza Singapura itself was officially opened in August 1975 by Hon Sui Sen, Singapore's then Minister for Finance. The early format combined supermarket and department-store retail, making the centre a significant modern shopping destination for the period. Over time, the mall moved away from a primarily department-store-led identity and developed into a multi-category shopping centre. Its location next to Dhoby Ghaut became increasingly valuable as public transport connectivity improved. During the SARS period, from 2002 to 2003, Plaza Singapura underwent renovation and tenant-mix changes. The work included refurbishment of the basement areas and the construction of a direct link to Dhoby Ghaut MRT station. Travelators were installed to improve movement among Basement 2, Basement 1 and Level 1. In 2008, the seventh floor was refreshed and given a more distinctive assortment of tenants. Toys, gifts, hobbies, anime merchandise and cosplay-related products were introduced or expanded, reinforcing the mall's appeal to younger consumers and specialist-interest shoppers. This complemented the centre's broader family and youth orientation. The largest redevelopment in the mall's history began in 2012. The project cost approximately S$150 million and was delivered in phases. The first phase converted the first three levels of Atrium@Orchard, previously used partly for offices, into retail space and linked the area to the original mall building. The second phase followed Carrefour's departure on 30 September 2012. Its former approximately 81,000-square-foot footprint was reconfigured for Cold Storage at Basement 2 and John Little at Level 1; these works were completed in June 2013. John Little later ceased operations in December 2016. The redevelopment added a new wing, approximately 80 retail and food-and-beverage units, and about 25 percent more retail floor area. The mall's stated retail area increased from roughly 497,575 square feet to 629,000 square feet. Its external appearance was also substantially altered through a wave-like frontage measuring about 170 metres. The frontage incorporated the colourful Jelly Baby Family sculptures created by Italian artist Mauro Peruchetti. Together, the architectural changes and revised tenant mix repositioned Plaza Singapura as a contemporary, accessible and diversified mall rather than a traditional department-store complex. Further interior upgrading took place in 2015. The works covered floor finishes, corridor lighting, toilets and lift lobbies, and included additional nursing rooms on Level 2. Tenant turnover continued to shape the centre. Urban Revivo occupied a significant former department-store area from 2017 until 2023, after which Muji took over the space. Times Bookstore closed in February 2024 and was replaced by The Travel Store. Other established or prominent tenants have included Daiso, Cotton On and Uniqlo, alongside restaurants and cafes representing Japanese, Chinese, Thai, Vietnamese, Italian, American and other cuisines. Plaza Singapura remains open as an active Orchard Road shopping centre managed by CapitaLand. A further major revamp is planned in phases from the third quarter of 2026 to the fourth quarter of 2028, with a focus on stronger links to nearby green spaces. The mall is expected to continue operating during the works, although Golden Village cinema is scheduled to close permanently in August 2026. Its history is therefore defined by continuity of location and purpose, combined with repeated architectural, transport, tenant and public-realm adaptations.

  • 2026

    Planned phased revamp begins

    [1]

    A major phased revamp is scheduled to begin in the third quarter, with completion planned for the fourth quarter of 2028.

  • 2024

    Travel retail replaces bookstore

    [1]

    Times Bookstore closed in February and its former space was replaced by The Travel Store.

  • 2015

    Interior upgrades completed

    [1]

    Interior works upgraded finishes, lighting, toilets and lift lobbies, and added more nursing rooms.

  • 2013

    Expanded mall opens in phases

    [1]

    The redevelopment's later phase was completed, including the reconfiguration of former Carrefour space for Cold Storage and John Little and the addition of new retail and dining units.

  • 2012

    Major redevelopment starts

    [1]

    A major redevelopment costing approximately S$150 million began, including the construction of a new wing and conversion of Atrium@Orchard space into retail accommodation.

  • 2008

    Level 7 repositioned

    [1]

    Level 7 received a facelift and gained more toy, gift, hobby, anime and cosplay-related tenants.

  • 2003

    Dhoby Ghaut MRT link completed

    [1]

    A direct connection to Dhoby Ghaut MRT station was constructed, strengthening the mall's public-transport accessibility.

  • 2002

    SARS-period refurbishment begins

    [1]

    A renovation and tenant-mix programme began during the 2002–2003 SARS period, including basement improvements and better internal circulation.

  • 1975

    Official opening

    [1]

    Plaza Singapura was officially opened in August by Hon Sui Sen, Singapore's then Minister for Finance.

  • 1974

    Yaohan begins operations

    [1]

    Yaohan's supermarket opened in October, followed by the department store on 1 November, establishing the mall's original retail anchor.

Products and positioning

A centrally located, accessible and family-friendly Orchard Road shopping centre combining everyday retail, youth-oriented lifestyle offerings, dining and entertainment.

  • Shopping centre retail · 1974

    Retail and lifestyle directory

    Plaza Singapura provides a multi-level retail environment covering apparel, beauty, household goods, gifts, toys, hobbies, books, travel products and everyday services. Its tenant mix has included established international and regional chains such as Uniqlo, Cotton On, Daiso and Muji, alongside specialist retailers. The centre is designed for convenient, frequent visits rather than a narrow luxury proposition, with accessibility reinforced by its Orchard Road location and direct Dhoby Ghaut MRT connection.

  • Dining

    Food and beverage cluster

    The mall's dining offer spans casual restaurants, cafes, fast food and specialist cuisine. Referenced outlets and concepts include Italian food at Mamma Mia Trattoria E Caffè, Vietnamese dishes at Co Chung, halal-certified Cajun seafood at Cajun on Wheels, Thai-style chicken rice at Go-Ang Pratunam Chicken Rice, Japanese tempura and udon at Akimitsu and Tamoya Udon & Tempura, Japanese-inspired food at Muji Café, American burgers at Five Guys and Nanjing cuisine at Nanjing Impressions.

  • Entertainment

    Entertainment facilities

    Entertainment has formed part of Plaza Singapura's family and youth-oriented proposition, including the Golden Village cinema. The cinema is scheduled to close permanently in August 2026 in connection with the mall's forthcoming redevelopment plans.

  • Mall infrastructure · 1974

    Parking and transport access

    The centre includes a seven-storey carpark at the rear with approximately 752 parking spaces and a two-level goods bay beneath it. Its direct connection to Dhoby Ghaut MRT station is a defining operational feature, supporting access from across Singapore and complementing the mall's central Orchard Road location.

Brand decisions

  • 2026

    Planned green-space-oriented revampStrategy

    Background

    Plaza Singapura is scheduled for another major transformation as its operator seeks to strengthen the mall's relationship with surrounding green spaces and update the precinct experience.

    Action taken

    A phased revamp is planned from the third quarter of 2026 through the fourth quarter of 2028. The mall is expected to remain open during the works, while Golden Village is scheduled to close permanently in August 2026.

    Aftermath

    The project is expected to alter the centre's public-realm connections and tenant or entertainment configuration, although the detailed final design and financial commitment are not specified in the available reference material.

  • 2012

    Large-scale redevelopment and retail expansionStrategy

    Background

    The mall needed to modernise its format, expand its retail offer and replace or repurpose spaces affected by changing department-store and supermarket operations. The project also sought to integrate Atrium@Orchard with the main mall.

    Action taken

    Management undertook a phased redevelopment involving a new wing, conversion of former office and Carrefour areas, a new wave-shaped facade and a revised tenant mix. The project added approximately 80 retail and food-and-beverage units and expanded retail floor area by about 25 percent.

    Aftermath

    The enlarged centre opened with Cold Storage and John Little occupying parts of the former Carrefour footprint, while the redesigned facade introduced the Jelly Baby Family sculptures. John Little later ceased operations in December 2016.

    Redevelopment cost. S$150 million (2012–2013 redevelopment)

Sources2 sources

Cite this profile: Cite the canonical profile. /brand-wiki/plaza-singapura · Editorial policy · How profiles are compiled