Skip to content

WindMW

German offshore wind farm operator behind the Meerwind Süd and Meerwind Ost projects near Helgoland.

Last updated September 27, 2026

AI crawler reads

No AI crawler has read this profile since Oct 28, 2026.

Overview

WindMW GmbH is a German company that operates the Meerwind Süd and Meerwind Ost offshore wind farms located off the coast of Helgoland in the German North Sea. According to its official website, the two wind farms together comprise 80 offshore wind turbines of the 3.6 MW class, feeding a total capacity of up to 288 MW into the electricity grid since September 2014. This output is described as sufficient to supply nearly 360,000 households with climate-friendly electricity. The company states that the Meerwind Süd | Ost wind farm was completed and ready for grid connection in April 2014 after only 18 months of construction. WindMW presents the project as a contribution to sustainable, ecological energy generation, claiming that it helps avoid approximately 1 million tonnes of CO2 annually compared with electricity generation from coal-fired power plants. WindMW is headquartered at Rickmer-Bock-Wai 1210, 27498 Helgoland, Germany. The company maintains a website at windmw.de that provides information about the wind farm, the project timeline, press materials, links, jobs, and contact details. The site emphasizes a minimal cookie policy, using only technically necessary cookies and explicitly stating that no cookies are used for marketing or analytics purposes. As a corporate entity, WindMW is identified in Wikidata as a German company. The available evidence does not specify its founding year, ownership structure, or parent company. Its business is focused on offshore wind energy generation and the operation of the Meerwind Süd and Meerwind Ost assets in the German North Sea.

History

WindMW GmbH is a German company associated with the development and operation of the Meerwind Süd and Meerwind Ost offshore wind farms in the German North Sea, located off the coast of Helgoland. The official website states that the wind farm Meerwind Süd | Ost was completed and ready for grid connection in April 2014 after only 18 months of construction. Since September 2014, the two wind farms have been feeding electricity into the grid using 80 offshore wind turbines of the 3.6 MW class, with a total capacity of up to 288 MW. According to the company, this is enough to supply nearly 360,000 households with climate-friendly electricity. WindMW also states that the project contributes to sustainable, ecological energy generation and helps avoid approximately 1 million tonnes of CO2 annually compared with coal-fired power generation. The company is headquartered at Rickmer-Bock-Wai 1210, 27498 Helgoland, Germany. Wikidata identifies WindMW as a German company. Beyond these facts, the available evidence does not provide details on the company's founding, ownership changes, or subsequent developments.

  • 2014

    Meerwind Süd | Ost wind farm completed and ready for grid connection in April after 18 months of construction.

  • 2014

    Since September, the two wind farms feed up to 288 MW into the grid using 80 offshore turbines of the 3.6 MW class.

Products and positioning

Operator of large-scale offshore wind farms contributing to Germany's sustainable energy supply and CO2 reduction.

  • Meerwind Süd offshore wind farm

    Offshore wind farm off Helgoland, part of the Meerwind Süd | Ost project.

  • Meerwind Ost offshore wind farm

    Offshore wind farm off Helgoland, part of the Meerwind Süd | Ost project.

Sources2 sources

Cite this profile: Cite the canonical profile. /brand-wiki/windmw · Editorial policy · How profiles are compiled