Resita Data Infrastructure SRL

Romanian pre-development data center site origination company developing a grid-adjacent hyperscale campus in Resita, Western Romania.

Last updated September 29, 2026

AI crawler reads

No AI crawler has read this profile since Oct 28, 2026.

Overview

Resita Data Infrastructure SRL is a Romanian pre-development data center site origination company based in Resita, in Caras-Severin County, Western Romania. The company is developing a data center campus on industrial land at Calea Caransebesului Km 7.5 in Resita, positioned as a grid-adjacent alternative to the congested FLAP corridor (Frankfurt, London, Amsterdam, Paris). Its proposition centers on direct high-voltage grid adjacency to a Transelectrica node, EU sovereign jurisdiction, and a clean special-purpose vehicle (SPV) corporate structure. The site, designated RES1, is described as having direct adjacency to a Transelectrica 400/220/110 kV grid node, with a 250 MVA transformer (Trafo 1) confirmed and commissioned in November 2024. The company states that an ATR (technical connection approval) is requested and pending, and that a formal connection study (Studiu de Solutie) was submitted and registered under Nr. 29067/29.05.2026. The land parcel, identified by cadastral reference CF Nr. 51122, covers 30,000 m² and is scalable to approximately 31 hectares. Water supply is sourced from the Barzava river at 3.63 m³/s, certified by INHGA. The site holds four EU PCI (Project of Common Interest) designations under ENTSO-E TYNDP Project 144. The company is seeking a majority controlling interest sale to a Western European wholesale operator or digital infrastructure fund. Corporate structure and equity documentation are available in a virtual data room (VDR) under NDA. The project also involves a 49-year administrative concession application on the Transelectrica node, with the titular of the land recorded as Municipiul Resita. The site is in a low-to-moderate seismic zone (Zone C, ag=0.10g) and includes N+1 diesel generator backup power in the Phase 1 design. As a pre-development origination company, Resita Data Infrastructure SRL does not yet operate a live data center; its value lies in land control, grid adjacency, permitting progress, and EU sovereign positioning. The company is privately held and structured as a clean SPV.

History

Resita Data Infrastructure SRL is a Romanian pre-development data center site origination company based in Resita, Caras-Severin County, Western Romania. It is registered under CUI 54450187. The company's purpose is to originate and de-risk a data center site — securing land, grid adjacency, permitting, and concession rights — before selling a majority controlling interest to an operator or infrastructure fund. The project site, RES1, is located at Calea Caransebesului Km 7.5 in Resita. The land parcel is identified by cadastral reference CF Nr. 51122, covering 30,000 m² and scalable to approximately 31 hectares. The titular of the land is recorded as Municipiul Resita (Resita Municipality). The company has applied for a 49-year administrative concession on a Transelectrica grid node. A key milestone was the commissioning in November 2024 of a 250 MVA transformer (Trafo 1) adjacent to the site, providing direct high-voltage grid adjacency to a Transelectrica 400/220/110 kV node. The company states that an ATR (technical connection approval) has been requested and is pending. A formal connection study (Studiu de Solutie) was submitted and registered under Nr. 29067/29.05.2026. The site holds four EU PCI (Project of Common Interest) designations under ENTSO-E TYNDP Project 144. Water supply is from the Barzava river at 3.63 m³/s, certified by INHGA. The site is in seismic Zone C with ag=0.10g (low-moderate), and the Phase 1 design includes N+1 diesel generator backup power. The company is marketing a majority controlling interest to a Western European wholesale operator or digital infrastructure fund. Corporate structure and equity documentation are available in a virtual data room (VDR) under NDA. As of the available evidence, the project remains in pre-development, with the ATR pending and no live data center operations.

  • 250 MVA transformer (Trafo 1) commissioned adjacent to the site, providing direct high-voltage grid adjacency to a Transelectrica 400/220/110 kV node.

  • Formal connection study (Studiu de Solutie) submitted and registered under Nr. 29067/29.05.2026; ATR pending.

  • Land parcel CF Nr. 51122 verified with no encumbrances (Sarcini: NU SUNT).

Products and positioning

Grid-adjacent EU sovereign data center site as an alternative to the congested FLAP corridor, offering majority control to a wholesale operator or digital infrastructure fund.

  • Site RES1 — grid-adjacent data center campus

    31 ha scalable industrial land at Calea Caransebesului Km 7.5, Resita, with direct adjacency to a Transelectrica 400/220/110 kV node, 250 MVA Trafo 1 confirmed, 49-year administrative concession application, water from Barzava river, four EU PCI designations.

Sources2 sources