Nepali hydropower company operating the 111 MW Rasuwagadhi run-of-river plant in Rasuwa district, a subsidiary of Chilime Hydropower Company Limited.

Last updated September 29, 2026

AI crawler reads

No AI crawler has read this profile since Oct 28, 2026.

Overview

No content in this language yet.

History

Rasuwagadhi Hydropower Company Limited (RGHPCL) was incorporated in August 2011 as a public limited company in Nepal. It was established as a subsidiary of Chilime Hydropower Company Limited (CHPCL), a Nepali hydropower developer, to build and operate the Rasuwagadhi Hydroelectric Project in Rasuwa district. The project was conceived as a run-of-river scheme on the border rivers between Nepal and China (Tibet), with headworks about 400 m downstream of the confluence of the Kerung Khola and Lende Khola. Financing for the 111 MW project was structured with both debt and equity. The debt requirement was met through a long-term loan from the Employees Provident Fund (EPF), formalized in a tri-partite loan arrangement signed among EPF, CHPCL and RGHPCL on 2068/08/22 in the Nepali calendar. The equity side was divided into 51% promoter shares and 49% public shares. Among the promoters, Chilime Hydropower Company held 32.79%, Nepal Electricity Authority (NEA) held 18%, and local authorities of Rasuwa District held 0.21%. This mixed ownership gave the company a broad base of corporate, state and public shareholders. The project's technical parameters include an installed capacity of 111 MW, an annual energy generation of 613.875 GWh, a gross head of 167.9 m and a design discharge of 80 m³/s at Q40 exceedance. The headrace tunnel runs 4,185 m to the surge tank, and a 715 m tailrace tunnel returns water to the main river course downstream of the powerhouse. The project site is in Gosaikunda Rural Municipality, wards 1 and 2 (Thuman and Timure), accessible via the Kathmandu–Trisuli–Somdang road, about 130 km north of Kathmandu to Syabrubesi and then about 16 km to the site at Rasuwagadhi. The plant reached its Commercial Operation Date (COD) on 16 Poush 2081, corresponding to 31 December 2024. After COD, the company continued to publish investor information, annual reports, AGM reports, procurement notices and recruitment announcements through its website. In 2026, the company reported a severe flood event that caused major damage to physical structures at the project and left the status of a director and many employees unknown, as disclosed in its notices. The company also issued a notice suspending the further selection process for its CEO in August 2026.

  • Rasuwagadhi Hydropower Company Limited incorporated as a public limited company in Nepal.

  • Tri-partite loan arrangement signed among Employees Provident Fund (EPF), Chilime Hydropower Company Limited (CHPCL) and RGHPCL.

  • Commercial Operation Date (COD) of the 111 MW Rasuwagadhi Hydropower Plant, corresponding to 16 Poush 2081.

  • Notice issued regarding suspension of the further selection process of the CEO.

  • Notice published about project loss and missing employees due to flooding.

Products and positioning

A publicly held Nepali hydropower generator and subsidiary of Chilime Hydropower Company Limited, operating a 111 MW run-of-river plant in Rasuwa district.

  • Rasuwagadhi Hydropower Plant