Oasis of the Seas
An Oasis-class cruise ship operated by Royal Caribbean International and introduced in 2009.
Last updated August 21, 2026
Overview
Oasis of the Seas is a large cruise ship operated by Royal Caribbean International, a cruise brand within Royal Caribbean Group. It is the first vessel in the Oasis class, a ship family developed to combine the scale of a resort with the mobility and itinerary flexibility of an ocean-going cruise ship. When completed, it established a new benchmark for passenger capacity and briefly became the largest passenger ship in the world, surpassing Royal Caribbean's earlier Freedom-class ships. It was subsequently exceeded in size by other Oasis-class vessels, including Allure of the Seas, Harmony of the Seas and Symphony of the Seas, and later by ships in Royal Caribbean's Icon class. The vessel originated as Project Genesis. Royal Caribbean ordered the ship in February 2006, and its keel was laid at STX Europe's Turku Shipyard in Finland on 12 November 2007. The name Oasis of the Seas was selected through a public competition in 2008. Construction and finishing work were completed in 2009, and the ship was formally delivered to Royal Caribbean on 28 October of that year. During its transfer from Finland to the United States, the ship passed beneath Denmark's Great Belt Fixed Link with its telescoping funnels retracted and arrived at Port Everglades in Fort Lauderdale on 13 November 2009. Its maiden voyage began on 5 December 2009. At launch, Oasis of the Seas had gross tonnage of approximately 225,282 and capacity for as many as 6,669 passengers, making it a landmark in contemporary cruise-ship design. Its layout is organized around several themed neighborhoods rather than a single continuous interior. Major spaces include the open-air Central Park and Boardwalk areas, an AquaTheater, entertainment venues, pools, restaurants, bars, youth facilities and sports areas. Attractions include a zip line, an ice-skating rink, a FlowRider surf simulator, water slides, a casino, miniature golf, nightlife venues and the Ultimate Abyss dry slide. This combination of accommodation, dining, entertainment and large-scale attractions positions the ship as a floating resort aimed at families, couples and multigenerational groups. The ship is powered by six Wärtsilä marine-diesel generator sets that produce electricity for hotel systems and propulsion. Three ABB Azipod electric propulsion units and bow thrusters provide maneuverability. Solar panels installed on an upper deck supply electricity for lighting in selected public areas. The vessel also carries 18 lifeboats, each designed for 370 people, together with additional inflatable life rafts. Oasis of the Seas has undergone several rounds of maintenance and modernization. A minor refit took place in 2011, followed by a larger drydock refit in October 2014, during which the main dining room was divided into three restaurants. After a Mediterranean deployment in 2019, the ship underwent an extensive drydock program lasting almost three months. The work added or refreshed amenities and increased gross tonnage to approximately 226,838 through the addition of cabins on Deck 14. The ship was then repositioned to Miami for the following season and was scheduled to become the first Oasis-class vessel homeported at Cape Liberty in New Jersey in 2020. Pandemic-related operational disruptions changed those plans. By late 2024, the ship was operating Caribbean cruises from Port Everglades and Cape Liberty, with Port Everglades again serving as a home port after its return from a Mediterranean season.
History
Oasis of the Seas was developed as Project Genesis, Royal Caribbean's effort to create a new class of cruise ships substantially larger and more spatially differentiated than its Freedom-class predecessors. The vessel was ordered in February 2006 and constructed at STX Europe's Turku Shipyard in Finland. Its keel was laid on 12 November 2007. The ship's name was selected through a competition held in May 2008, reflecting the vessel's resort-like concept and its extensive open-air public spaces. During construction, a tugboat incident at the first float-out caused the port side to contact the dock. The damage was described as cosmetic and minor, was repaired, and did not delay delivery. Royal Caribbean announced in April 2009 that full funding for the project had been secured. The completed ship was delivered on 28 October 2009 and departed Finland for the United States two days later. The transfer voyage attracted attention because of the ship's passage beneath Denmark's Great Belt Fixed Link on 31 October 2009. Oasis of the Seas normally had an air draft greater than the bridge's clearance, but retractable funnels, the vessel's speed and the squat effect reduced the effective height sufficiently for the passage, which occurred with very limited clearance. After a brief stop in the Solent to allow shipyard workers to leave, the ship continued to Port Everglades, arriving on 13 November 2009. Tropical plants and other final preparations were installed before introductory cruises and the maiden voyage on 5 December. Oasis of the Seas entered service as the first Oasis-class ship and briefly held the title of the world's largest passenger ship. Its launch gross tonnage was approximately 225,282, and it could carry up to 6,669 passengers. The design divided the ship into neighborhood-style zones, including Central Park and Boardwalk, enabling the vessel to offer multiple atmospheres and circulation areas rather than one undifferentiated interior. Its facilities included an AquaTheater, pools, waterslides, sports courts, a zip line, an ice rink, a surf simulator, a casino, children's areas, nightclubs and numerous restaurants and lounges. The ship received a minor refit in winter 2011. A second drydock in October 2014 changed the main dining room into three restaurants. In 2019, after a Mediterranean deployment, it spent almost three months in drydock receiving new and upgraded amenities. Cabins added on Deck 14 increased gross tonnage to about 226,838. The vessel then moved to Miami for fall and winter operations and was planned for Cape Liberty in New Jersey in 2020. The global COVID-19 crisis interrupted those plans. During a March 2020 sailing, Royal Caribbean reported a possible infection to U.S. health authorities, passengers disembarked in Miami, and the company suspended sailings. Crew infections and deaths followed during the ship's layup. Oasis of the Seas later returned to cruise operations, continuing the broader Royal Caribbean strategy of deploying large ships on Caribbean and Mediterranean itineraries. By November 2024, it had returned to Port Everglades and was operating Caribbean cruises from that port as well as from Cape Liberty.
- 2024Return to Port Everglades
The ship returned to Port Everglades in November after a Mediterranean season.
- 2020Passenger operations are suspended during the pandemic
A possible COVID-19 case reported after a March sailing preceded passenger disembarkation and the suspension of cruise operations.
- 2019Major modernization and crane repairs
After a crane collapse in April, the ship received repairs in Cádiz and completed a broader drydock modernization before returning to service in May.
- 2014Dining facilities are reorganized
A drydock refit divided the main dining room into three restaurants.
- 2011First reported refit
The ship underwent a minor refit during the winter.
- 2009Delivery and maiden voyage
Royal Caribbean took delivery on 28 October, the ship reached Florida in November, and passenger service began on 5 December.
- 2008The ship receives its name
Oasis of the Seas was selected as the winning name in a public competition.
- 2007Keel is laid at Turku
Construction formally advanced when the keel was laid at STX Europe's Turku Shipyard on 12 November.
- 2006Royal Caribbean orders the first Oasis-class ship
The vessel was ordered in February under the development name Project Genesis.
Products and positioning
A large-scale, family-oriented floating resort combining destination cruising with extensive onboard entertainment, dining, accommodation and recreational attractions.
Oasis of the Seas cruise shipCruise ship2009
The sole vessel represented by the Oasis of the Seas name. It sells cruise vacations rather than a standalone consumer product, providing cabins, restaurants, bars, pools, entertainment, sports, children's facilities and organized shore itineraries. Its neighborhood layout, Central Park, Boardwalk and AquaTheater distinguish it from smaller conventional cruise ships, while attractions such as the zip line, FlowRider, waterslides and Ultimate Abyss support the ship's floating-resort positioning.
Flagship businesses
- Oasis of the Seas cruise itineraries
- Central Park and Boardwalk neighborhood experience
- AquaTheater performances
- Ultimate Abyss dry slide
- FlowRider surf simulator
- Zip line and water-slide attractions
Marketing campaigns
- 2009Naming ceremony and charity sailing
United States · International
The formal naming ceremony took place on 30 November 2009 during a charity sailing benefiting the Make-A-Wish Foundation. Seven godmothers represented the ship's seven neighborhoods.
Outcome. The event linked the new ship's neighborhood concept with a high-profile charitable launch.
- 2008Public naming competition
International
Royal Caribbean invited the public to participate in choosing the name of its first Project Genesis vessel. Oasis of the Seas was selected in May 2008.
Outcome. The winning name became the permanent identity of the first Oasis-class ship.
Brand decisions
- 2024Return to Port Everglades home-port operationsStrategy
After a Mediterranean season, Royal Caribbean revised the ship's deployment for Caribbean service.
What changed. Oasis of the Seas returned to Port Everglades in November 2024 while also operating from Cape Liberty.
Aftermath. The move restored Port Everglades as one of the ship's principal home ports.
- 2020Passenger operations suspended during COVID-19Strategy
A possible COVID-19 infection was reported after the 8–15 March sailing as cruise operators faced rapidly tightening public-health restrictions.
What changed. Passengers disembarked in Miami on 15 March and Royal Caribbean stopped passenger sailings.
Aftermath. The ship remained out of normal passenger service while crew infections and deaths were reported during the layup.
- 2019Major drydock modernizationGeneration change
The ship was scheduled for a substantial upgrade after its Mediterranean season and also required repairs following the April crane collapse.
What changed. Royal Caribbean sent the ship to drydock for almost three months, repaired damage in Cádiz and added or refreshed amenities and cabins.
Aftermath. The ship returned to service on 5 May, its gross tonnage increased to approximately 226,838, and it was repositioned to Miami.
- 2014Dining-room conversion during drydockGeneration change
Royal Caribbean used a scheduled drydock to modify the ship's food-and-beverage offering.
What changed. The main dining room was divided into three separate restaurants.
Aftermath. The change expanded the ship's restaurant format and refreshed the onboard dining proposition.
- 2006Royal Caribbean commissions the Project Genesis vesselProduct launch
Royal Caribbean sought a ship substantially larger and more amenity-rich than its preceding Freedom-class ships.
What changed. The company ordered the vessel that would become Oasis of the Seas, establishing the Oasis class.
Aftermath. The completed ship briefly became the world's largest passenger ship and formed the basis for a larger sister-ship program.
Recent events
- 2024Oasis of the Seas returns to Port Everglades
After a Mediterranean season, the ship returned to Port Everglades in November 2024, marking its first home-porting there since November 2016.
Other - 2024A passenger dies during a later charter cruise
Another passenger died aboard Oasis of the Seas during a similarly chartered cruise in January 2024.
Other - 2022A passenger dies during an Atlantis Events charter
A passenger died unexpectedly aboard the ship during the Oasis Caribbean Cruise, a chartered sailing organized by Atlantis Events.
Other - 2020A passenger dies after an overboard incident in Puerto Rico
A 46-year-old passenger went overboard while the vessel was docked in Puerto Rico and suffered fatal injuries.
Other - 2020COVID-19 suspends Oasis of the Seas operations
Following a 8–15 March sailing, Royal Caribbean notified the U.S. Centers for Disease Control and Prevention of a possible COVID-19 case. Passengers disembarked in Miami on 15 March, and passenger sailings were suspended. Several crew members later tested positive, and three crew deaths were reported in connection with COVID-19 during the ship's layup.
RegulationOther - 2019Maintenance cranes collapse in the Bahamas
Two cranes collapsed on the ship during maintenance in the Bahamas on 1 April 2019. Eight people sustained non-life-threatening injuries, and the resulting damage required repairs in Cádiz and led to the cancellation of three sailings.
Other - 2019Oasis of the Seas returns to service after repairs
Following repairs associated with the crane accident and an extensive modernization program, the ship returned to service on 5 May 2019.
Other - 2019Oasis of the Seas is nearly struck by Carnival Legend
The ship was involved in a near-collision incident with Carnival Legend while both vessels were in port at Cozumel, Mexico.
Other - 2015A passenger is rescued after going overboard
A 20-year-old passenger went overboard while the ship was sailing near Cozumel, Mexico, and was rescued approximately five hours later by Disney Magic.
Other - 2015A passenger dies after going overboard near Turks and Caicos
A passenger fell from a balcony area near the Turks and Caicos Islands. The death was treated as suicide; a lawyer for the passenger's family disputed aspects of the circumstances.
Other - 2014The ship receives a 2014 drydock refit
A drydock program reorganized the main dining room into three separate restaurants and updated the ship's facilities.
Other - 2009Oasis of the Seas is delivered to Royal Caribbean
The completed vessel was handed over by the Turku shipyard on 28 October 2009 and began its transfer voyage to the United States two days later.
Other - 2009Oasis of the Seas begins maiden voyage
After reaching Port Everglades and completing introductory preparations, the ship entered passenger service on 5 December 2009.
Product launch
Sources
Cite this profile: Cite the canonical profile. /brand-wiki/oasis-of-the-seas · Editorial policy · How profiles are compiled