Metronit
A bus rapid transit system serving Haifa and the surrounding metropolitan area in Israel.
Last updated August 25, 2026
AI crawler reads
No AI crawler has read this profile since Oct 28, 2026.
Overview
Metronit is the branded bus rapid transit system of Haifa, Israel, and the first system of its type to operate in the country. It was developed to provide high-capacity metropolitan transport without the construction requirements and cost structure of a conventional light-rail line. The system serves Haifa, the Krayot communities, Kiryat Ata, Yagur and other destinations in the surrounding urban area through a network combining dedicated busways with sections that operate on ordinary roads. The project was developed by Yefe Nof, a company owned by the City of Haifa and responsible for transportation planning, infrastructure and related construction projects in the metropolitan area. A tender for operating the service was published in 2009, and Dan was selected in 2010 for a 12-year operating concession. Construction and implementation were completed in time for vehicle testing in August 2013, while passenger service began on 16 August 2013. The system initially faced operational difficulties, including inadequate traffic-signal priority, shortages of trained drivers and demand that exceeded early expectations. A temporary free-ridership period was used to introduce the network and ended in December 2013. Metronit's network is approximately 60 kilometres long, including about 40 kilometres of dedicated roadway. Its fleet consists of high-capacity buses, including bi-articulated vehicles that can carry approximately 120 to 140 passengers. Most vehicles are MAN Lion's City GL diesel buses, while a small number of Phileas hybrid buses were used for evaluation. The use of large buses allows the system to offer substantial capacity while reducing the need for extensive rail infrastructure and limiting construction impacts on existing urban corridors. The system has five numbered services. Line 1 links the Krayot Central Bus Station with Hof HaCarmel. Line 2 connects Kiryat Ata with Bat Galim, while Line 3 links the Krayot Central Bus Station with Hadar HaCarmel. Line 4 broadly follows the Line 1 corridor but uses the Carmel Tunnels rather than HaHagana Boulevard. Line 5 normally connects Yagur with Hadar HaCarmel; a weekend variant, designated 5A, runs to Bat Galim. Metronit is notable in Israel for operating selected services during the Sabbath, including Lines 1 and 5A, although weekend schedules and routes are distinct from the regular weekday pattern. The name was selected through a public competition that reportedly received roughly 500 proposals. It combines the metropolitan implication of “Metro” with a Hebrew feminine suffix associated with the Carmelit, Rakvalit and Shkhunatit transport names used in the Haifa area. The brand therefore positions the service as a modern, recognizable metropolitan transport mode rather than as a conventional local bus route. In its first year, the network reportedly carried about 30 million passengers, and daily ridership was reported at approximately 92,000 in May 2015. Operations transferred from Dan North to Superbus in October 2021.
History
Metronit was conceived as a metropolitan transport project for Haifa and its surrounding communities. Its development was led by Yefe Nof, a municipally owned company involved in transportation planning and infrastructure in the Haifa area. The project sought to increase public-transport capacity on major corridors while avoiding the cost, construction disruption and fixed infrastructure associated with a conventional light-rail system. The planned solution was a bus rapid transit network using large vehicles and substantial sections of dedicated roadway. An operating tender was issued in September 2009. In August 2010, Dan was announced as the successful bidder and was expected to operate the system for 12 years. The project was estimated at approximately 1.5 billion Israeli new shekels in the reference material, although this figure describes the system project rather than Metronit as a commercial company. The design ultimately produced a network of about 60 kilometres, around 40 kilometres of which consists of dedicated bus routes. Vehicle testing began on 2 August 2013, followed by the start of passenger operations on 16 August. As the first BRT system in Israel, Metronit encountered several launch problems. Traffic-signal priority was not initially sufficient, the operator had too few drivers and passenger demand was higher than anticipated. The service used an initial free-ridership promotion to encourage public adoption, which concluded on 23 December 2013. The fleet was designed around high-capacity buses, including bi-articulated vehicles capable of carrying roughly 120 to 140 passengers. Six Phileas hybrid buses were used in an evaluation program, while the principal fleet consisted of conventional diesel MAN Lion's City GL buses. This approach was intended to provide high capacity, lower construction impact and potentially lower operating costs than a standard bus or rail alternative. Metronit's network expanded into a five-line structure serving the Krayot, Haifa's central and western districts, Kiryat Ata and Yagur. The system's route design includes both dedicated infrastructure and road-running sections. It also has a distinctive weekend role: Lines 1 and 5A operate during the Sabbath, a comparatively uncommon arrangement in Israel. In May 2015, reported daily ridership was approximately 92,000, and cumulative first-year usage was reported at around 30 million passenger trips. In October 2021, operational responsibility moved from Dan North to Superbus. Metronit remains a major component of public transport in the Haifa metropolitan area. Its name was selected through a public competition and was intended to evoke both metropolitan rapid transport and the established naming conventions of Haifa's Carmelit, Rakvalit and Shkhunatit services.
- 2021
Superbus becomes operator
[1]Superbus took over operational responsibility from Dan North.
- 2015
Ridership reaches reported peak level
[1]Daily ridership was reported at approximately 92,000 in May, following about 30 million passenger trips in the first year.
- 2013
Testing and public launch
[1]Vehicle testing began on 2 August, and passenger service commenced on 16 August.
- 2013
Introductory free-ridership period ends
[1]The initial free-travel promotion concluded on 23 December.
- 2010
Dan wins operating tender
[1]Dan was selected to operate Metronit under an initially planned 12-year concession.
- 2009
Operating tender published
[1]Yefe Nof published a tender for the operation of the planned Haifa bus rapid transit system.
Products and positioning
A high-capacity, metropolitan public-transport alternative positioned between conventional bus service and rail-based rapid transit.
Bus rapid transit routes · 2013
Metronit Lines 1 and 4
Line 1 connects the Krayot Central Bus Station with Hof HaCarmel. Line 4 serves a broadly similar corridor but uses the Carmel Tunnels rather than HaHagana Boulevard, providing an alternative alignment through the Haifa metropolitan network.
Bus rapid transit routes · 2013
Metronit Lines 2 and 3
Line 2 links Kiryat Ata with Bat Galim, while Line 3 runs between the Krayot Central Bus Station and Hadar HaCarmel. Together they extend the system's reach across northern metropolitan communities and central Haifa destinations.
Bus rapid transit routes · 2013
Metronit Line 5 and weekend Line 5A
The regular Line 5 connects Yagur with Hadar HaCarmel. During weekends, a differently routed service designated 5A operates toward Bat Galim. The weekend operation is one of Metronit's distinctive features within Israel's public-transport landscape.
Transit vehicles · 2013
Metronit high-capacity bus fleet
The system uses approximately 18.75-metre high-capacity buses, including bi-articulated vehicles with stated capacities of roughly 120 to 140 passengers. The fleet includes MAN Lion's City GL diesel buses and a small group of Phileas hybrid buses evaluated for possible wider adoption.
Marketing campaigns
- 2013Free introductory rides
Haifa metropolitan area
Metronit offered free rides during its initial public introduction to encourage trial use and build awareness of the new BRT network.
Outcome. The promotion ended on 23 December 2013. The system subsequently reported strong early usage, including approximately 30 million passengers in its first year.
- Public naming competition
Israel
A public competition invited suggestions for the system's name, with roughly 500 proposals reportedly submitted. Metronit was selected for its memorability, metropolitan association and connection with existing Haifa transport names.
Outcome. The selected name became the permanent public identity of the Haifa BRT system.
Brand decisions
2021
Change the operating companyStrategyBackground
The operating arrangement for Metronit changed after the initial period under Dan North.
Action taken
Superbus took over operation of the system in October 2021.
Aftermath
Superbus became the operator identified with the system's subsequent service period.
2013
Launch Israel's first bus rapid transit systemProduct launchBackground
Haifa needed additional metropolitan capacity without building a conventional light-rail system across the planned corridors.
Action taken
Metronit began passenger operations on 16 August 2013 after a testing period.
Aftermath
The launch experienced traffic-priority, staffing and demand-management problems, but the service developed into a major regional transport network.
Estimated project cost. 1.5 billion NIS (Project estimate reported before or around the system launch)
2010
Select a private operator for the BRT systemStrategyBackground
Yefe Nof sought an operator for the new metropolitan bus rapid transit network after publishing a tender in 2009.
Action taken
Dan was selected in August 2010 to operate Metronit under a planned 12-year arrangement.
Aftermath
Dan operated the system through the initial launch period; operational responsibility later transferred to Superbus in 2021.
Sources2 sources
Cite this profile: Cite the canonical profile. /brand-wiki/metronit · Editorial policy · How profiles are compiled