LM Wind Power
A Danish manufacturer of wind-turbine blades and a subsidiary of GE Vernova.
Last updated August 25, 2026
AI crawler reads
No AI crawler has read this profile since Oct 28, 2026.
Overview
LM Wind Power is a Danish wind-energy equipment manufacturer best known for designing and producing wind-turbine blades. The company is headquartered in Kolding, Denmark, and traces its origins to 1940, when it was established in Lunderskov as Lunderskov Møbelfabrik, a furniture manufacturer. Its industrial direction changed in the early 1950s after the business examined commercial uses for glass-fibre technology. The company subsequently adopted the name LM Glasfiber and moved away from its original furniture plan. During the 1970s, LM developed and produced sailing boats, including the LM 24, helping it build experience with glass-fibre structures and composite manufacturing. Its transition into wind energy began in 1978, when it started making wind-turbine blades. This activity became the core of the business and ultimately made LM one of the major independent blade suppliers in the global wind industry. LM Wind Power’s work spans blade engineering, composite manufacturing, testing, and related service activities. Its products are used in both onshore and offshore wind projects, where blade length, structural reliability, aerodynamic performance, transportation, and compatibility with turbine platforms are central requirements. The company has also operated research and development facilities in Denmark, the Netherlands, and India, supporting product and manufacturing development across different wind markets. The business expanded internationally through production and engineering operations in Denmark, Spain, the United States, Canada, India, China, Poland, and Brazil. Reference material describes production facilities in 13 locations across eight countries and approximately 4,505 employees worldwide at the end of 2014. In addition to its manufacturing footprint, LM maintained an office in Amsterdam and a global R&D network. From 2001 until 2017, the main stakeholders were investment partnerships organized by Doughty Hanson & Co. During that period, LM was presented as the world’s largest independent wind-blade provider. In April 2017, GE Renewable Energy agreed to purchase LM Wind Power for €1.5 billion. The company subsequently became part of GE’s renewable-energy operations and is now identified as a subsidiary of GE Vernova. The acquisition placed LM’s blade-design and manufacturing capabilities within a larger industrial platform spanning wind-turbine technology and other renewable-energy activities. LM Wind Power’s current identity is therefore that of a specialized component manufacturer operating within a major renewable-energy group. Unlike a turbine brand that sells complete wind turbines directly under a single platform name, LM’s principal specialization is the blade: a large, technically demanding composite structure that affects a turbine’s energy capture, loads, transport, installation, and long-term operation. Its brand positioning is consequently associated with industrial-scale engineering, composite expertise, manufacturing reach, and supply to the international wind-power sector.
History
LM Wind Power originated in 1940 as Lunderskov Møbelfabrik, or Lunderskov furniture factory, in the Danish town of Lunderskov. The business initially pursued furniture production. In 1952, it investigated commercial applications for glass-fibre technology. That exploration redirected the company away from its original furniture plans and led to the adoption of the name LM Glasfiber. The company’s early glass-fibre activities were not limited to wind energy. In the 1970s, it produced sailing boats, including the LM 24. These products gave the business practical experience in designing and manufacturing large glass-fibre structures. The company did not begin manufacturing wind-turbine blades until 1978, but blade production subsequently became its defining business. Over the following decades, LM developed into an international supplier to the wind industry. Its activities centered on the engineering and production of composite blades for onshore and offshore turbines, supported by testing, research, development, and service capabilities. The company established a broad operating network covering Denmark, Spain, the United States, Canada, India, China, Poland, and Brazil. Reference material identifies 13 production locations across those eight countries, along with R&D centers in Denmark, the Netherlands, and India. It also identifies an office in Amsterdam. At the end of 2014, the company employed approximately 4,505 people worldwide. A notable demonstration of LM’s increasingly global and technically ambitious operations occurred in June 2010. The company arranged for an Antonov An-225 aircraft to transport two new 42-metre blades from its factory in Tianjin, China, to its test facility in Lunderskov, Denmark. The flight was associated with an aviation record involving the world’s longest piece of air cargo. The event illustrated both the scale of modern wind blades and the logistical challenges of moving them between manufacturing and testing sites. Ownership also changed during LM’s expansion. From 2001 to 2017, investment partnerships organized by Doughty Hanson & Co. were the company’s principal stakeholders. During this period, LM was described as the largest independent blade provider globally. In April 2017, GE Renewable Energy purchased the business for €1.5 billion. The transaction made LM part of GE’s renewable-energy operations and ended its period as an independently owned major blade supplier. LM Wind Power is now a subsidiary associated with GE Vernova. Its historical development reflects the transformation of a Danish furniture and glass-fibre business into a global renewable-energy manufacturer. The company’s enduring specialization is the wind-turbine blade, a critical composite component whose aerodynamic shape, structural performance, size, transportability, and durability influence the operation of complete wind turbines.
- 2017
Acquired by GE Renewable Energy
[1]GE Renewable Energy purchased LM Wind Power for €1.5 billion, integrating the blade manufacturer into its renewable-energy business.
- 2014
Global workforce reaches approximately 4,505
[1]Reference material reports approximately 4,505 employees worldwide at the end of 2014.
- 2010
42-metre blades transported by An-225
[1]Two blades were flown from Tianjin to Lunderskov aboard an Antonov An-225 in an aviation-record logistics operation.
- 2001
Doughty Hanson becomes associated with ownership
[1]Investment partnerships organized by Doughty Hanson & Co. became the company’s main stakeholders during the following ownership period.
- 1978
Wind-turbine blade production begins
[1]LM began manufacturing wind-turbine blades, establishing the business line that later defined the company.
- 1970
Glass-fibre sailing boats produced
[1]During the 1970s, the company produced sailing boats such as the LM 24, building experience in large glass-fibre structures.
- 1952
Glass-fibre technology becomes a strategic direction
[1]The company investigated commercial applications for glass-fibre technology and subsequently moved away from its original furniture-manufacturing plan.
- 1940
Lunderskov Møbelfabrik founded
[1]The business was established in Lunderskov, Denmark, originally as a furniture factory.
Products and positioning
A specialized, high-end global supplier of composite wind-turbine blades, with capabilities spanning blade design, manufacturing, testing, and service.
Wind-turbine components · 1978
Onshore wind-turbine blades
Composite blades designed for land-based wind turbines. These products must balance aerodynamic energy capture with structural strength, transport constraints, manufacturability, and long-term operation in varied environmental conditions. LM Wind Power’s onshore blade activity forms part of its broader engineering and manufacturing specialization.
Wind-turbine components
Offshore wind-turbine blades
Large composite blades for offshore wind applications, where blade scale, reliability, logistics, testing, and resistance to demanding marine conditions are especially important. The offshore product area represents LM’s participation in the technically demanding segment of utility-scale wind generation.
Engineering services
Blade design, engineering, and testing
LM Wind Power’s offering extends beyond factory production to blade design, engineering development, testing, and related technical support. Its R&D network in Denmark, the Netherlands, and India supports the development and validation of products for international wind-turbine programs.
Brand decisions
2017
Sale to GE Renewable EnergyM&ABackground
After a period of ownership by investment partnerships organized by Doughty Hanson & Co., LM was sold to a major renewable-energy equipment group.
Action taken
GE Renewable Energy acquired LM Wind Power for €1.5 billion.
Aftermath
LM ceased to be an independently owned blade supplier and became part of GE’s renewable-energy operations, later associated with GE Vernova.
Acquisition price. €1.5 billion (April 2017)
1978
Entry into wind-turbine blade manufacturingProduct launchBackground
After developing experience with glass-fibre structures, including sailing boats, the company entered the emerging wind-energy equipment market.
Action taken
LM began producing wind-turbine blades.
Aftermath
Wind-blade manufacturing became the company’s core specialization and supported its later growth into a global supplier.
1952
Shift from furniture toward glass-fibre technologyStrategyBackground
The original business was a furniture manufacturer, but management investigated commercial uses for glass-fibre technology.
Action taken
The company abandoned its original furniture-manufacturing plan and repositioned itself around glass-fibre activities, later operating as LM Glasfiber.
Aftermath
The technological shift created the foundation for later composite products, including sailing boats and eventually wind-turbine blades.
Recent events
- 2017
LM Wind Power acquired by GE Renewable Energy[1]
M&A
GE Renewable Energy purchased LM Wind Power for a reported total consideration of €1.5 billion, bringing the Danish blade manufacturer into GE’s renewable-energy business.
- 2010
LM Wind Power transported record-length blades by Antonov An-225[1]
Other
LM commissioned an Antonov An-225 to carry two 42-metre wind-turbine blades from its Tianjin factory in China to its testing facility in Lunderskov, Denmark, contributing to an aviation record for the longest single piece of air cargo.