Ferrocarriles Argentinos
Historical Argentine state railway company that operated the national passenger and freight network from 1948 until its breakup during the 1990s railway privatization program.
Last updated August 31, 2026
Overview
Ferrocarriles Argentinos, commonly abbreviated FA, was Argentina’s national railway company and the principal state operator of the country’s rail system for almost 45 years. It was created after the nationalization of the privately owned railway companies during the first presidency of Juan Domingo Perón. The nationalization brought British, French and Argentine railway assets under public control and was presented by the government as an assertion of economic sovereignty and a means of supporting industrial and territorial development. The company initially operated a very extensive network organized into six regional railway systems named for Argentine presidents and national heroes: General San Martín, General Belgrano, Domingo Faustino Sarmiento, General Urquiza, Bartolomé Mitre and General Roca. These divisions reflected differences in geography, track gauge and the historical origins of the lines. FA managed nearly every major form of railway activity in the country, including long-distance passenger trains, Buenos Aires metropolitan commuter services, regional operations and freight transport. It also inherited workshops, stations, rolling stock and infrastructure from the former private companies. The network continued expanding after nationalization and reached approximately 47,000 kilometres at its postwar peak in 1954, making it the largest railway system in Latin America. The period also saw substantial modernization. Steam traction was progressively supplemented and replaced by diesel locomotives, railcars and electric multiple units. Imported equipment came from suppliers including Baldwin-Lima-Hamilton, Cockerill-Ougrée, Whitcomb, Werkspoor, English Electric, Ganz, Hitachi and Budd. At the same time, Argentina sought to develop domestic railway manufacturing through enterprises such as FAdeL and Materfer. The Justicialista locomotive, designed and built under engineer Pedro Sacaggio, represented an early attempt to produce a locally designed mainline diesel locomotive. FA’s history also included repeated efforts to rationalize the network. The Larkin Plan, developed during the late 1950s, proposed reducing lines and workshops considered redundant. Although a nationwide railway strike in 1961 prevented complete implementation, numerous branches were closed, infrastructure was removed and railway employment was reduced. In the late 1960s, General Juan Carlos De Marchi led a modernization and investment program that sought to renew rolling stock and improve the system’s technical performance. From the 1970s onward, financial pressure, changing transport policy, declining investment and political instability weakened the company. Under President Carlos Menem, the railway system was restructured and privatized or transferred to provincial and concessionary operators. Ferrocarriles Argentinos was broken up and dissolved in 1993, ending its role as the unified national railway operator. The name was revived by the government of Cristina Fernández de Kirchner in 2015 for use in connection with reorganized state-owned railway services, but this later use did not restore the original company in its former form.
History
The origins of Ferrocarriles Argentinos lay in the Argentine state’s acquisition of the country’s foreign-owned railway companies after the Second World War. Negotiations with British railway interests began in 1946, while French railway companies were acquired through an agreement signed in December of that year. The Argentine government paid for the acquisitions through arrangements connected to exports, particularly meat and cereals, to the United Kingdom. On 1 March 1948, during Juan Domingo Perón’s first presidential term, the state took control of the British railways. The French and other privately operated systems were incorporated into the national structure soon afterward. The new national system was first organized under the name Empresa de Ferrocarriles del Estado Argentino, or EFEA, before the Ferrocarriles Argentinos identity became established. Six principal divisions were created, using the names of national heroes and presidents. The divisions brought together lines with different gauges and operating histories, including the former British, French and Argentine companies. The state also reorganized individual assets: the Midland and Compañía General lines became part of the Belgrano system, while the former Buenos Aires Provincial Railway was integrated after a transitional period. The Buenos Aires Central Railway was acquired in 1949 and added to the General Urquiza network. Nationalization initially expanded the reach and strategic importance of the railway system. The network reached about 47,000 kilometres in 1954. FA operated passenger and freight trains throughout Argentina, including metropolitan services around Buenos Aires and long-distance routes linking the capital with the interior. Patagonia contained several isolated state-built systems, some of which were later incorporated into the national railway structure. Not all inherited or acquired branches survived: some lightly used lines were closed, including a short branch serving the Basilica of Our Lady of Luján. Modernization was a central theme of the company’s postwar operation. Steam locomotives were progressively supplemented by diesel traction and new passenger equipment. In 1951, Budd coaches were adapted for Argentine broad-gauge operation and used on the El Marplatense express service. The coaches introduced steel construction, air conditioning, improved glazing, restaurant facilities and more comfortable seating compared with older wooden stock. FA also acquired locomotives and railcars from North American and European manufacturers. During the 1950s and 1960s, domestic production became increasingly important. FAdeL produced the CM1 Justicialista locomotive, which entered service in the early 1950s, while Materfer later manufactured railcars and coaches in Córdoba. Fiat Concord 7131 railcars entered service on metropolitan and regional routes from 1962. Expansion was followed by rationalization. The Larkin Plan, associated with United States General Thomas B. Larkin, proposed a substantial reduction in the network, closure of workshops and elimination of lines judged economically inefficient. By 1959, the operating network had fallen to approximately 44,000 kilometres. The plan provoked strong labor opposition, culminating in a 42-day railway strike in 1961. Although the entire proposal was not carried out, numerous branches were closed, tracks were lifted and railway employment declined. A later modernization phase began after the 1966 military coup, when General Juan Carlos De Marchi became president of Ferrocarriles Argentinos. His administration announced a five-year investment program and pursued fleet renewal, including the acquisition of EMD locomotives and other modern equipment. These initiatives improved parts of the system but did not eliminate its structural financial and operational difficulties. Economic volatility, maintenance backlogs, competition from road transport and changing public policy continued to affect the railway. During the 1980s and early 1990s, the company’s position deteriorated further. The government of Carlos Menem adopted a broad privatization policy. Freight lines and metropolitan passenger services were transferred to concessionaires, while some intercity services were abandoned or passed to provincial governments. Ferrocarriles Argentinos was ultimately dissolved in 1993. The breakup ended the unified national operator, leaving Argentina’s railway system divided among concessionaires, provincial entities and later successor state organizations. In 2015, the Cristina Fernández de Kirchner administration revived the Ferrocarriles Argentinos name in the state railway sector, reflecting renewed public involvement but not a legal restoration of the original company.
- 2015Brand revived in the state railway sector
The Ferrocarriles Argentinos name returned for use by reorganized state-owned railway services.
- 1993Company dissolved
Ferrocarriles Argentinos was broken up after railway privatization and the transfer of services to concessionaires and provinces.
- 1968Modernization program begins under De Marchi
General Juan Carlos De Marchi led a program centered on investment and renewal of railway equipment.
- 1962Fiat 7131 railcars enter service
Locally produced Fiat Concord 7131 railcars began operating on sections of the General Mitre Railway.
- 1961National railway strike
A prolonged strike opposed network rationalization and prevented the Larkin Plan from being implemented in full.
- 1958Materfer established
Fiat established Materfer in Argentina to manufacture railway rolling stock for the national railway system.
- 1954Network reaches its historical peak
The national railway network reached approximately 47,000 kilometres, its greatest recorded extent.
- 1951Justicialista locomotive introduced
The FAdeL CM1 locomotive, designed by Pedro Sacaggio, was presented as an Argentine-built diesel locomotive.
- 1948British railways taken into state ownership
Argentina completed the takeover of the British railway companies and consolidated the national network under state management.
- 1946Negotiations for railway nationalization begin
The Argentine government began formal arrangements to acquire foreign-owned railway companies operating in the country.
Products and positioning
National railway operator and public infrastructure enterprise
Long-distance passenger servicesPassenger rail1948
FA operated intercity trains connecting Buenos Aires with major Argentine cities and regions, including Mar del Plata, Bariloche, Córdoba, Mendoza, Tucumán and Posadas. Services varied from ordinary passenger trains to named expresses and included both domestic and, on some routes, international connections.
El MarplatenseExpress passenger service1951
El Marplatense was a premium express linking Constitución station in Buenos Aires with Mar del Plata. Its postwar service used Budd-built steel coaches adapted to Argentine gauge and offered features such as air conditioning, improved insulation, comfortable seating, bar facilities and a restaurant car.
Metropolitan commuter railUrban rail service1948
The company operated commuter services in the Buenos Aires metropolitan area through the Mitre, Sarmiento, Roca, Belgrano, San Martín and Urquiza railway divisions. Equipment included diesel railcars and, on parts of the Mitre system, Hitachi electric multiple units.
Freight railway servicesRail freight1948
FA managed freight operations across Argentina’s national railway network. Freight services supported agricultural, industrial and regional economic activity and used infrastructure inherited from the former private railway companies and later reorganized into the six national divisions.
FAdeL CM1 JusticialistaDiesel locomotive1951
The CM1 Justicialista was an early Argentine diesel locomotive developed and built at the Liniers workshops by FAdeL under engineer Pedro Sacaggio. It entered service on long-distance routes including El Marplatense and later operated toward Bariloche and Mendoza.
Fiat Concord 7131Diesel railcar1962
The 7131 was a lightweight two-car diesel railcar powered by a Fiat engine. Its two driving cabs reduced turnaround time at terminal stations, and its low axle loading allowed operation on a range of Argentine routes. It entered service on Mitre division suburban and regional sections in 1962.
Flagship businesses
- El Marplatense express service between Buenos Aires and Mar del Plata
- Long-distance services to Bariloche, Córdoba, Mendoza, Tucumán and other Argentine cities
- Buenos Aires metropolitan commuter services
- Trenes Argentinos Operaciones passenger services
- Trenes Argentinos Cargas freight services
- Trenes Argentinos Infraestructura railway infrastructure services
- Trenes Argentinos Operaciones
- Trenes Argentinos Cargas
- Trenes Argentinos Infraestructura
Marketing campaigns
- 1948Railway nationalization
Argentina
The Perón government framed the acquisition of foreign-owned railways as an act of national sovereignty and an instrument for economic development and industrial integration.
Outcome. The country’s major railway companies were consolidated under state ownership and operated as a unified national system.
Brand decisions
- 2015Revival of the Ferrocarriles Argentinos identityStrategy
The Argentine government increased its role in railway services and reorganized parts of the fragmented post-privatization system.
What changed. The Ferrocarriles Argentinos name was revived for state-owned railway operations.
Aftermath. The brand returned to public railway use, but the original 1948 company was not restored as the same unified organization.
- 1993Privatization and dissolutionStrategy
The Menem administration pursued market-oriented restructuring of Argentina’s railways after sustained financial and operational difficulties.
What changed. Passenger and freight operations were privatized, concessioned or transferred to provincial authorities, and Ferrocarriles Argentinos was dissolved.
Aftermath. The unified national railway operator disappeared and services became divided among concessionaires, provinces and later state entities.
- 1968Fleet modernization and capital investmentStrategy
The railway required renewed rolling stock and infrastructure investment after years of rationalization and operational pressure.
What changed. General Juan Carlos De Marchi led a modernization plan that included a proposed five-year investment program and acquisition of new diesel locomotives and other equipment.
Aftermath. The program renewed portions of the fleet but did not resolve the company’s longer-term financial and structural problems.
- 1955Adoption of railway rationalization measuresStrategy
The government sought to reduce operating costs by addressing lines, branches and workshops regarded as redundant under the Larkin Plan.
What changed. Several lines and branches were closed, tracks were removed and railway employment was reduced, although the full proposed network reduction was not achieved.
Aftermath. The measures generated major labor opposition and contributed to the 1961 national railway strike.
Recent events
- 2024Trenes Argentinos Capital Humano is dissolved
The national government dissolved the human-resources division known as Trenes Argentinos Capital Humano. The measure was presented as a cost-saving action, with reported claimed annual savings of 42,000 million Argentine pesos; the supplied reference does not provide an independently specified currency basis or financial source beyond the cited article.
Leadership changeOther - 2021Ferrocarriles Argentinos is reactivated after a period of inactivity
The Transport Ministry announced the reactivation of FASE as part of a railway modernisation programme. The relaunch established offices at Constitución railway station and introduced a logo derived from the historic Ferrocarriles Argentinos identity.
Leadership changeOther - 2021Ferrocarriles Argentinos is relaunched after a period of inactivity
The Transport Ministry announced the operational relaunch of FASE, opened offices at Constitución railway station, and introduced a logo derived from the identity of the former national railway company.
Leadership changeOther - 2015Ferrocarriles Argentinos name revived for state railways
The Argentine government revived the Ferrocarriles Argentinos name for use in the reorganized state-owned railway sector.
Leadership change - 2015Argentina approves creation of Ferrocarriles Argentinos Sociedad del Estado
Argentina's Congress approved legislation establishing the state-owned railway entity as part of a plan to bring the national railway network back under public control. Existing private operators were allowed to continue under concessions, subject to potential renegotiation or cancellation.
Regulation - 2015Re-nationalisation railway law is promulgated
The law establishing Ferrocarriles Argentinos Sociedad del Estado was formally promulgated, providing the legal basis for public administration and oversight of Argentina’s railway system.
Regulation - 1993National railway privatization and breakup
The Menem administration dismantled Ferrocarriles Argentinos as passenger and freight services were privatized, concessioned or transferred to provincial control.
M&A - 1959Railway network rationalization advances under the Larkin Plan
A program to reduce the railway network, close branches and workshops, and lower operating costs led to major closures and workforce reductions, although it was not fully implemented.
Regulation - 1948Argentina nationalizes the British-owned railways
The Argentine government completed the takeover of the British railway companies, consolidating the assets into the national railway system that became Ferrocarriles Argentinos.
Other
Sources
Cite this profile: Cite the canonical profile. /brand-wiki/ferrocarriles-argentinos · Editorial policy · How profiles are compiled