Enemalta
Malta's state-owned electricity company, responsible for electricity distribution and the development of the national electricity network.
Last updated October 14, 2026
AI crawler reads
No AI crawler has read this profile since Oct 28, 2026.
Overview
Enemalta plc is Malta's state-owned electricity company and a central institution in the country's energy system. Its principal responsibility is the distribution of electricity throughout the Maltese Islands and the development, maintenance and modernization of the national electricity distribution network. The company also coordinates the dispatch of electricity from the generating facilities connected to Malta's system and operates emergency generation capacity at the Delimara Power Station. It has been described as Malta's only energy company and employs approximately 600 people. The company operates in a particularly constrained energy environment. Malta has no significant domestic fossil-fuel resources and has historically relied on imported fuels for electricity generation. This dependence exposed the national system to fuel costs, generation inefficiencies and limited redundancy. Enemalta's infrastructure has therefore evolved from a collection of conventional oil-fired stations toward a more interconnected and gas-oriented system. Older generating facilities in Floriana, Corradino and Marsa were progressively retired, while the Malta–Sicily electricity interconnector added access to the Italian grid and increased the system's flexibility. A major turning point came during the energy reforms of the 2010s. At the beginning of that period Enemalta faced serious financial pressure, with debt reported at approximately €840 million and a downgrade by Standard & Poor's. The government's energy plan sought to reduce utility tariffs, improve the financial position of the company and replace older heavy-fuel-oil generation with cleaner and more efficient infrastructure. Tariff reductions subsequently made Malta's utility prices substantially more competitive by European Union standards, although the policy and the projects used to achieve it remained politically controversial. In December 2014, Shanghai Electric entered into an agreement to acquire a 33.3% stake in Enemalta for €250 million, while the Maltese government retained majority ownership. The restructuring was intended to provide capital for network investment, improve the company's financial position and support the transition to gas generation, interconnection and renewable energy. Shanghai Electric was required to invest in the conversion of an existing Delimara generating unit from heavy fuel oil to gas. Enemalta and Shanghai Electric also created a joint venture for renewable-energy opportunities in Europe. The Malta–Sicily interconnector, operating with a capacity of 200 MW from April 2015, became an important part of the transformed system. The Delimara Power and Gas project, developed by Electrogas Malta, introduced new gas-fired generation and an LNG supply chain. The gas-fired plant was officially opened in April 2017, at the same time as the 25-year-old Delimara I heavy-fuel-oil plant was switched off. The Marsa power plant, whose principal facilities dated from earlier decades, was shut down in 2014 and demolished by 2016. Its closure was associated with a substantial reduction in carbon dioxide emissions, while the Delimara chimney was demolished in 2018. Enemalta remains strategically important because it combines public ownership with responsibility for essential infrastructure. Its activities include electricity distribution, network expansion, system coordination and participation in arrangements that affect generation and supply security. The company has also been connected to politically sensitive transactions, particularly the Možura wind-farm investment and the Electrogas project. These matters generated investigations and public debate concerning procurement, ownership structures, conflicts of interest and the use of public guarantees. The available reference material does not establish criminal liability against Enemalta as an institution. It does, however, place the company at the centre of Malta's broader debate about energy policy, governance and accountability.
History
Enemalta developed as Malta's public electricity institution, operating and coordinating a succession of generating stations as the island's electricity demand expanded. Earlier facilities included a Floriana power plant operating from 1896 to 1960, a Corradino station operating from 1939 to 1992 and Station A in Marsa, which operated from 1953 to 1993. The Marsa power station, commissioned in 1966 with a reported capacity of 267 MW, became one of the principal conventional facilities in the national system. Enemalta also operated emergency and reserve capacity at Delimara. Malta's energy model was shaped by the absence of domestic fuel resources. The company depended on imported fuels, particularly for oil-fired generation, leaving the system exposed to international fuel prices and environmental costs. In 2006, Enemalta's two power plants produced 2,261,189 MWh and were reported to have emitted 0.8782 kilograms of carbon dioxide per kilowatt-hour generated. The system's limited redundancy also made the addition of external interconnection and new generation strategically important. Energy policy changed substantially after 2013, when the government introduced a plan focused on reducing tariffs, stabilizing Enemalta and changing the generation mix. The company was reported to be close to bankruptcy, carrying approximately €840 million in debt and having suffered a Standard & Poor's downgrade. The government's tariff policy reduced electricity costs and was presented as a means of improving household affordability and industrial competitiveness. At the same time, the policy attracted criticism over the allocation and procurement of major infrastructure projects. The restructuring of Enemalta included the December 2014 agreement under which Shanghai Electric acquired 33.3% of the company for €250 million. Malta retained control, while the new investment was intended to support network upgrades, the conversion of existing generation to gas and the development of cleaner energy sources. In 2016, after the restructuring and investment, Standard & Poor's upgraded Enemalta's rating to BB− with a stable outlook, according to the reference material. The physical system was also modernized. The Malta–Sicily interconnector, operating at 200 MW from April 2015, connected the Maltese grid to Italy. The Marsa plant was shut down in 2014 and completely demolished two years later. More than 700,000 tonnes of carbon dioxide were reported to have been avoided through its closure, and Eurostat statistics recorded Malta as having the largest reduction in emissions in the European Union during the relevant period. The government also planned the retirement of older Delimara heavy-fuel-oil assets, subject to maintaining the required N-1 level of system security. The Delimara Power and Gas project supplied the main new generation component. Electrogas Malta, a consortium involving SOCAR, Siemens and Gem Holdings, developed the gas-fired plant and associated LNG infrastructure. Enemalta was to purchase electricity from the project, while Electrogas contracted to supply electricity and LNG over a long period. The gas plant opened in April 2017, replacing the 25-year-old Delimara I unit, and the former plant chimney was demolished in 2018. Enemalta and Shanghai Electric also cooperated in renewable energy. Their joint venture participated in the Možura wind-farm project in Montenegro. The transaction later became the subject of investigations and intense political controversy after allegations that Yorgen Fenech's company 17 Black profited from the acquisition structure. The matter was discussed alongside wider investigations into the Electrogas project and the assassination of journalist Daphne Caruana Galizia. These events made Enemalta a recurring subject in Malta's public debate about energy procurement, political influence and corporate transparency. Enemalta nevertheless continues to operate as the country's central electricity distribution and network-development company.
- 2018
Delimara chimney demolished
[1]The former 150-metre chimney associated with the older Delimara plant was demolished.
- 2017
Delimara gas-fired plant opens
[1]The new gas-fired plant was inaugurated and the older Delimara I unit was switched off.
- 2016
Enemalta credit outlook improves
[1]Standard & Poor's upgraded Enemalta to BB− with a stable outlook after the restructuring and investment process.
- 2015
Malta–Sicily interconnector reaches 200 MW operation
[1]The interconnector began linking Malta with Italy's electricity network at a capacity of 200 MW.
- 2014
Marsa plant shuts down
[1]The Marsa power plant was taken offline as Malta moved away from older heavy-fuel-oil generation.
- 2014
Shanghai Electric restructuring agreement
[1]Shanghai Electric agreed to acquire a 33.3% interest in Enemalta for €250 million.
- 1992
Delimara emergency generation begins
[1]The Delimara Power Station's emergency plants began operating, with reported capacity of 444 MW.
- 1966
Marsa power plant is commissioned
[1]The Marsa power plant was commissioned with a reported capacity of 267 MW.
- 1939
Corradino power plant begins operation
[1]The Corradino station entered service and remained part of Malta's generating system until 1992.
- 1896
Floriana power plant begins operation
[1]The Floriana power plant began operating, forming part of Malta's early electricity-generation infrastructure before its closure in 1960.
Products and positioning
State-owned national electricity infrastructure and distribution operator
Utility service
Electricity distribution
Enemalta is responsible for distributing electricity across the Maltese Islands. This includes operating the distribution system, maintaining network assets and supporting the delivery of electricity to homes, businesses and other users. Distribution is the company's core public-service function and distinguishes it from a conventional retail energy brand.
Energy infrastructure
National electricity network
The company develops and manages Malta's national electricity distribution network. Its modernization program has included new substations, improved redundancy, integration of imported electricity and adaptations required by newer generation technologies. The network is central to Malta's energy security because the country has limited domestic generation resources and relies on imported fuels and interconnection.
Grid operations
Electricity system coordination
Enemalta coordinates the dispatch of electricity from Malta's available generating facilities and the Malta–Sicily interconnector. This role requires balancing local generation, imported electricity and reserve capacity while maintaining system reliability. The company also operates emergency plants at Delimara to support continuity when ordinary capacity is unavailable or insufficient.
Power generation support · 1992
Delimara emergency generation
Enemalta operates emergency generating plants at the Delimara Power Station. The facilities, associated with capacity reported at 444 MW, provide reserve and contingency support within Malta's electricity system. Their role became especially important during the transition away from older Marsa and Delimara heavy-fuel-oil assets.
Electricity import infrastructure · 2015
Malta–Sicily interconnector integration
The Malta–Sicily interconnector gives Malta access to Italy's electricity network and has operated with a capacity of 200 MW since April 2015. Enemalta integrates the link into national system operations, allowing imported electricity to complement domestic generation and improving redundancy and flexibility.
Controversies
2020
Možura wind-farm transaction controversy
Investigations examined Enemalta's involvement in the acquisition of interests connected with the Možura wind farm in Montenegro. Allegations reported in the reference material stated that 17 Black, a company secretly associated with Yorgen Fenech, made approximately €4.6 million through the transaction. The matter was linked to wider questions about ownership structures, procurement and political influence. The allegations and criminal proceedings concerned individuals and companies; the source material does not establish criminal liability against Enemalta itself.
2017
Electrogas procurement and guarantee controversy
The Electrogas Malta project generated controversy over procurement, ownership and financing arrangements. The consortium included SOCAR, Siemens and Gem Holdings, while Yorgen Fenech and Tumas Energy were reported as connected to the project. The project was supported by a state guarantee and became part of broader investigations following the assassination of journalist Daphne Caruana Galizia. The European Commission reportedly stated that it found no procurement violations after questions were raised in the European Parliament.
Marketing campaigns
- 2013Energy tariff reduction and restructuring plan
Malta
The Maltese government's energy plan sought to reduce utility tariffs, restore Enemalta's financial stability and modernize the country's generation and distribution system. The program combined tariff policy with restructuring, interconnection, gas generation and network investment.
Outcome. Utility tariffs were reduced and the system moved toward gas-fired generation and greater use of interconnection. The policy improved reported price competitiveness but remained politically contested.
Brand decisions
2017
Shift generation from heavy fuel oil to gasGeneration changeBackground
The government's energy plan aimed to reduce emissions and improve the efficiency and security of Malta's electricity supply. Older Delimara and Marsa assets were increasingly unsuitable as the main basis of the system.
Action taken
Enemalta purchased electricity from the Electrogas Malta project, while a new gas-fired plant was opened at Delimara and the older Delimara I heavy-fuel-oil plant was switched off.
Aftermath
The project was expected to reduce particulate matter and help Malta satisfy the European Union's N-1 reliability principle. Its procurement, ownership and state-backed financing nevertheless became politically controversial.
2015
Integrate the Malta–Sicily electricity interconnectorStrategyBackground
Malta needed additional generating flexibility and improved system redundancy because it had no significant domestic fuel resources and had historically depended on oil-fired generation.
Action taken
Enemalta incorporated the 200 MW Malta–Sicily interconnector into national electricity operations, linking the Maltese grid with Italy's electricity network.
Aftermath
The interconnector expanded Malta's access to imported electricity and supported the broader transition toward a more flexible and diversified energy system.
2014
Accept a minority investment from Shanghai ElectricM&ABackground
Enemalta faced severe financial pressure and required capital for network renewal and generation modernization. The government also sought to reduce reliance on heavy fuel oil and strengthen the national electricity system.
Action taken
Shanghai Electric agreed to acquire 33.3% of Enemalta for €250 million, while the Government of Malta retained majority ownership. The restructuring included investment commitments and cooperation in renewable energy.
Aftermath
The transaction supported a restructuring process, and Standard & Poor's later upgraded Enemalta's rating to BB− with a stable outlook. It also led to joint renewable-energy activity, including participation in the Možura project.
Transaction value. €250 million (December 2014)
2014
Retire the Marsa power plantGeneration changeBackground
The Marsa station represented older, more carbon-intensive generation capacity, while Malta's energy strategy was moving toward gas generation and interconnection.
Action taken
The Marsa power plant was shut down and placed on cold standby before being completely demolished by 2016.
Aftermath
The closure was associated with a reported reduction of more than 700,000 tonnes of carbon dioxide and contributed to Malta's reported decline in emissions.
Recent events
- 2017
Delimara gas-fired power station opens[1]
Product launch
A new gas-fired generating facility at Delimara was inaugurated as the older Delimara I heavy-fuel-oil plant was taken out of service.
- 2015
Malta–Sicily interconnector becomes operational[1]
Product launch
The 200 MW interconnector linked Malta's electricity system with Italy's network, improving import capacity and system flexibility.
- 2014
Shanghai Electric acquires a minority stake in Enemalta[1]
M&A
Shanghai Electric agreed to acquire 33.3% of Enemalta for €250 million, with the Maltese government retaining majority ownership. The transaction formed part of a restructuring and investment plan for the electricity system.
- 2014
Marsa power plant is shut down and later demolished[1]
Other
The Marsa power plant was taken out of operation and subsequently demolished, contributing to the retirement of older, more carbon-intensive generation capacity.