Skip to content

Electricity Generating Authority of Thailand

Thailand's state-owned electricity generator, high-voltage transmission operator, and bulk electricity supplier.

Last updated August 22, 2026

AI crawler reads

No AI crawler has read this profile since Oct 28, 2026.

Overview

The Electricity Generating Authority of Thailand, commonly known as EGAT, is a state enterprise managed by Thailand's Ministry of Energy. Established on 1 May 1969, it consolidated public electricity-generation and transmission responsibilities and became a central institution in Thailand's national power system. Its statutory functions include generating, acquiring, supplying, and selling electricity; operating and maintaining transmission infrastructure; undertaking electricity-related businesses; and producing and selling lignite in accordance with its enabling legislation. EGAT is the largest individual electricity producer in Thailand, although its share of national generation has declined as independent power producers, small power producers, and imported electricity have expanded. The authority operates a diversified fleet that has included thermal, combined-cycle, hydroelectric, renewable-energy, and diesel facilities. Reference material describes plants at 45 sites with total installed capacity of 15,548 MW, while also noting that EGAT's output represented approximately 37 percent of Thailand's electricity in 2018. Natural gas has historically supplied most of its generation, with coal and lignite also playing an important role. EGAT operates the Mae Moh lignite mine in Lampang Province, which supplies its Mae Moh power complex. EGAT sells most of its electricity in bulk to the Metropolitan Electricity Authority, which serves Bangkok and surrounding areas, and the Provincial Electricity Authority, which distributes power elsewhere in Thailand. It also purchases electricity from independent and small power producers and from international sources, making it both a generator and a system-level coordinator within the country's power market. Its high-voltage transmission network links generating facilities, regional distribution systems, and cross-border or imported power supplies. The authority has been politically and commercially influential because Thailand's electricity sector has historically been organized around a small number of state institutions. Critics have argued that EGAT's dominant position can reduce competition, contribute to inefficient procurement, and slow the adoption of renewable energy. Concerns have also focused on coal dependence, environmental impacts, and reserve margins. In the 2010s, commentators questioned whether the combination of EGAT-owned capacity and contracted purchases produced surplus capacity substantially above commonly cited reliability levels. A proposed privatization in the 2000s became one of EGAT's most important institutional controversies. The government sought to corporatize the authority and list shares, but employee opposition, civil-society petitions, concerns over regulatory independence, and objections to retained expropriation powers culminated in a 2006 Supreme Administrative Court ruling that invalidated the restructuring. EGAT therefore remained a state enterprise rather than becoming a listed company. Alongside supply expansion, EGAT has promoted energy efficiency through its Demand Side Management program. The program, approved by the Thai cabinet in 1991 and publicly launched in 1993, developed the Energy Label No. 5 scheme for efficient appliances and later extended the label concept to other products. EGAT continues to participate in national power-development planning, balancing reliability, fuel security, transmission investment, energy efficiency, and the growth of renewable generation. It remains an active, state-owned utility whose role is shaped by Thailand's Ministry of Energy and national power-development plans.

History

EGAT was created on 1 May 1969 as Thailand developed a more integrated national electricity system. Its mandate brought together public-sector electricity generation, transmission, and bulk supply functions under a state enterprise supervised by the Ministry of Energy. The authority's legal responsibilities also covered electricity-related commercial activities and the production and sale of lignite. This framework made EGAT a foundational institution in Thailand's power sector rather than simply a conventional power-generation company. Over subsequent decades, EGAT built and operated a portfolio of thermal, combined-cycle, hydroelectric, renewable, and diesel facilities. It also developed the Mae Moh lignite mine and associated generating complex in Lampang Province. Gas-fired generation became a major component of its output, while coal and lignite supplied additional baseload capacity. Hydroelectric facilities and later renewable projects diversified the portfolio. EGAT's transmission role allowed it to connect generation sites with the Metropolitan Electricity Authority and Provincial Electricity Authority, which distribute electricity to consumers in Bangkok and the rest of the country. The structure of the electricity market gradually changed. Independent power producers and small power producers increased their contribution, while Thailand also imported electricity. As a result, EGAT's percentage share of national generation fell from levels reported at more than half of output in earlier periods to approximately 36–37 percent in the late 2010s. EGAT nonetheless retained a system-wide role because it continued to own important generation assets, operate the high-voltage grid, purchase electricity from other producers, and sell bulk power to distribution authorities. The authority's institutional status became the subject of a major dispute during the administration of Prime Minister Thaksin Shinawatra. Beginning in 2003, the government pursued corporatization and a proposed initial public offering. The plan was presented as a way to raise capital for new natural-gas power plants and modernize the enterprise. Employees organized large protests, with opposition focusing on job security, foreign ownership, national-security implications, inadequate regulation, and the possibility that EGAT would retain powers normally associated with the state. Although the authority was converted into EGAT PLC in 2005, the proposed listing was suspended after petitions by unions and civil-society groups. On 23 March 2006, Thailand's Supreme Administrative Court ruled against the privatization. The decision identified conflicts involving members of the privatization process, deficiencies in public and employee consultation, and the continued power to expropriate land for plants and transmission lines. The court nullified the decrees that had ended EGAT's state-enterprise status and established its new corporate charter. EGAT consequently remained a state enterprise and the proposed stock-market listing did not proceed. EGAT has also faced sustained debate over environmental policy and power planning. Critics have challenged coal-fired projects, the use of domestic lignite, and planning assumptions that could lock Thailand into fossil-fuel infrastructure. Others have questioned the level of reserve capacity created by combining EGAT's own plants with contracted purchases. These debates have taken place alongside national power-development plans that projected changing roles for gas, coal, imported hydropower, renewables, and possible nuclear generation. Demand-side management has been a parallel part of EGAT's public role. The Thai cabinet approved a dedicated program in 1991, and the first major public initiative began in 1993 under the slogan “Together in Conservation.” The Energy Label No. 5 program promoted efficient appliances and became one of EGAT's best-known consumer-facing initiatives. In 2017, the authority worked with textile organizations and producers on a clothing-related No. 5 initiative intended to reduce electricity used for ironing. Today, EGAT remains active as a state-owned generator, transmission operator, and bulk electricity seller. Its responsibilities encompass conventional and renewable generation, grid operation, fuel and supply planning, energy efficiency, and implementation of national power-policy priorities. Its financial scale remains substantial: reference material reports fiscal-year 2024 revenue of 719,648 million baht, net income of 49,611 million baht, and assets of 1,357,645 million baht. The authority's future position will continue to depend on electricity demand, independent generation, imported power, renewable deployment, environmental regulation, and Thailand's evolving power-development plans.

  • 2024

    Reported fiscal-year financial results

    [1]

    EGAT reports 2024 revenue of 719,648 million baht, net income of 49,611 million baht, and total assets of 1,357,645 million baht.

  • 2017

    Textile Energy Label No. 5 initiative

    [1]

    EGAT extends its efficiency-label concept to clothing intended to reduce electricity use for ironing.

  • 2006

    Court blocks privatization

    [1]

    The Supreme Administrative Court nullifies the decrees supporting EGAT's privatization, leaving the authority as a state enterprise.

  • 2005

    EGAT is corporatized

    [1]

    The authority is converted into EGAT PLC in preparation for a proposed listing, but the offering is subsequently suspended.

  • 2003

    Privatization initiative begins

    [1]

    The government begins pursuing corporatization and a public offering for EGAT.

  • 1993

    Energy conservation campaign begins

    [1]

    EGAT publicly launches its first major demand-side initiative under the “Together in Conservation” theme.

  • 1991

    Demand Side Management program approved

    [1]

    Thailand's cabinet approves the creation of EGAT's Demand Side Management program to promote more efficient electricity use.

  • 1969

    EGAT is established

    [1]

    The Electricity Generating Authority of Thailand is established on 1 May as a state enterprise responsible for electricity generation and transmission.

Products and positioning

Thailand's central state-owned power-generation and transmission institution, combining system reliability responsibilities with commercial electricity production and bulk supply.

  • Power generation · 1969

    Electricity generation

    EGAT generates electricity through a mixed fleet including thermal, combined-cycle, hydroelectric, renewable-energy, and diesel plants. Gas-fired generation has historically been its largest fuel-based segment, while coal and lignite remain significant in facilities associated with Mae Moh. The authority's generation portfolio supports national supply adequacy and is coordinated with purchases from independent producers and imports.

  • Electricity transmission · 1969

    High-voltage transmission

    EGAT operates Thailand's high-voltage transmission system, moving electricity from generating facilities and imported-power connections to the country's distribution authorities. This grid function gives the authority a system-coordination role that extends beyond its own generating plants and supports supply to the Metropolitan Electricity Authority and Provincial Electricity Authority.

  • Wholesale electricity · 1969

    Bulk electricity sales

    EGAT supplies electricity in bulk to Thailand's distribution authorities and participates in acquisition and sale arrangements involving independent power producers, small power producers, and imported electricity. Bulk sales connect national generation and transmission operations with retail distribution to Bangkok and provincial markets.

  • Energy efficiency program · 1993

    Energy Label No. 5

    Energy Label No. 5 is EGAT's consumer-facing efficiency-label program. It promotes appliances and other products that use less electricity, helping consumers identify more efficient options. The program originated within demand-side management and was later adapted for initiatives such as energy-saving clothing.

  • Fuel and mining

    Lignite

    EGAT operates the Mae Moh lignite mine and supplies lignite to its associated power facilities. The authority's statutory framework includes the production and sale of lignite, although the fuel has also been a focus of environmental and public-health criticism connected with coal-fired generation.

Marketing campaigns

  • 2017Shirt No. 5

    Thailand

    Working with the Thailand Textile Institute and clothing producers, EGAT promoted wrinkle-resistant clothing that could reduce the need for ironing and therefore lower electricity consumption.

    Outcome. Participating products began receiving the No. 5 label in January 2018.

  • 1993Together in Conservation

    Thailand

    EGAT's first major public demand-side management campaign promoted more efficient electricity use and established the basis for later consumer energy-efficiency programs.

    Outcome. The campaign led into EGAT's continuing energy-efficiency and appliance-labeling work.

  • 1993Energy Label No. 5 Project

    Thailand

    EGAT introduced the No. 5 energy label to encourage consumers to select efficient electrical appliances and reduce national electricity demand.

    Outcome. The label became a long-running national efficiency-marketing program and was later extended to additional product categories.

Brand decisions

  • 2015

    Power Development Plan fuel-mix strategyStrategy

    Background

    Thailand's Power Development Plan projected rising electricity demand and set indicative roles for imported hydropower, coal and lignite, renewables, natural gas, nuclear power, and oil-based generation through 2036.

    Action taken

    EGAT and the Ministry of Energy used the plan to guide generation and transmission development, including additional renewable and fossil-fuel capacity.

    Aftermath

    The plan became a focus of debate over coal dependence, emissions, renewable-energy priorities, and future reserve capacity.

  • 2006

    Supreme Administrative Court invalidates privatizationOther

    Background

    Petitioners challenged the legality and neutrality of the privatization process, including public-hearing procedures and EGAT's continuing authority to expropriate land.

    Action taken

    The court nullified the decrees that dissolved EGAT's state-enterprise status and created its replacement corporate charter.

    Aftermath

    The proposed listing was abandoned and EGAT continued operating as a government-owned state enterprise.

  • 2005

    Corporatization ahead of proposed listingStrategy

    Background

    The Thai government sought to privatize EGAT, raise capital, and fund new generation projects. Employee groups and civil-society organizations raised concerns about employment, regulation, public assets, and retained expropriation powers.

    Action taken

    EGAT was converted into EGAT PLC, but the planned stock-market listing was suspended after legal challenges.

    Aftermath

    The Supreme Administrative Court later nullified the privatization-related decrees and EGAT remained a state enterprise.

Sources2 sources

Cite this profile: Cite the canonical profile. /brand-wiki/electricity-generating-authority-of-thailand · Editorial policy · How profiles are compiled