Durango Casino and Resort
A hotel and casino resort in the Rhodes Ranch area of the Las Vegas Valley.
Last updated August 31, 2026
AI crawler reads
No AI crawler has read this profile since Oct 28, 2026.
Overview
Durango, also known as Durango Casino and Resort and originally developed under the name Durango Station, is a hotel-casino resort in the Rhodes Ranch area of the Las Vegas Valley, Nevada. The property occupies a prominent site at Durango Drive and the Las Vegas Beltway, southwest of the main Las Vegas resort corridor. It was developed by Station Casinos, whose parent company is Red Rock Resorts, as a new-generation locals-oriented resort serving the rapidly expanding communities of southwest Las Vegas. The site's development history stretches back more than two decades. Station Casinos acquired 51 acres from developer Jim Rhodes in 2000 for less than $37 million, later assembling additional land. The parcel had been zoned for a neighborhood casino, but Station initially waited for surrounding residential growth before committing to construction. In 2004, the company proposed a large hotel-casino with as many as 1,000 rooms and substantial gaming and entertainment space. Nearby residents objected to the project's scale, its proximity to a planned elementary school, and the view that a resort of that size exceeded the intended character of a neighborhood casino. The Clark County Commission approved the project in December 2004 while limiting the gaming area to 120,000 square feet. The controversy contributed to later county discussions about clearer rules for neighborhood casinos. Station subsequently reduced the scope of the proposal. A 2008 plan called for a 201-room hotel, casino, restaurants, a cinema, and a large retail component, with additional hotel capacity contemplated for a later phase. Construction was expected to start in 2009, but the Great Recession halted the project. Station Casinos entered bankruptcy proceedings that year, although the Durango site was retained for possible future development. Red Rock Resorts revived the project after reassessing the site's visibility, Beltway access, and proximity to fast-growing residential districts. In 2021, the company confirmed that construction would begin, and county approvals followed later that year. Preparation began before a ceremonial groundbreaking in March 2022. Designed by Friedmutter Group and built by W.A. Richardson Builder LLC, the resort opened on December 5, 2023, after a short postponement intended to give staff additional training time. The completed property contains an 83,178-square-foot casino, a 15-story hotel tower with 209 rooms and 29 suites, a 10,000-square-foot sportsbook, restaurants, a food hall, convention facilities, an event lawn, and electric-vehicle charging stations. Its gaming floor uses windows and natural light, an unusual feature for a Las Vegas casino, while the architecture and interiors draw on desert landscapes and the visual language associated with Red Rock Resorts. Dining is a major component, including the Eat Your Heart Out food hall with 11 food concepts, several standalone restaurants, and Summer House, a California-inspired venue operated by Lettuce Entertain You Enterprises. Durango is positioned as an upscale but accessible locals resort rather than a destination megaresort. It combines casino gaming, sports betting, dining, hotel rooms, meetings, and live-event space for residents and visitors in the southwest valley. The property is also strategically important to Station Casinos because it is the company's first new hotel-casino in the Las Vegas area since Aliante Station opened in 2008 and represents a renewed phase of expansion. A south-side expansion began in January 2025, with further gaming and dining development planned for a later northern expansion.
History
Durango's development began with Station Casinos' acquisition of land in southwest Las Vegas. In 2000, the company purchased 51 acres from developer Jim Rhodes for less than $37 million. The site sat at the southwest corner of Durango Drive and the Las Vegas Beltway, beside the Rhodes Ranch community. Station later acquired additional acreage, although part of the assembled property was subsequently sold for residential development. The first major proposal emerged in 2004 under the Durango Station name. Station envisioned a hotel-casino with a tower approximately 217 feet high, up to 1,000 rooms, and a casino of as much as 215,000 square feet. Residents of Rhodes Ranch and nearby communities challenged the plan, arguing that its scale was inconsistent with a neighborhood casino and expressing concern about its location near a planned elementary school and future housing. The dispute was also shaped by earlier conflicts between residents and Station Casinos over the proposed Red Rock Resort in Summerlin. The Clark County Commission approved the project in December 2004, but imposed a 120,000-square-foot cap on gaming space. The decision remained controversial, and the episode helped prompt county consideration of more precise neighborhood-casino regulations. Station explored a faster development timetable in 2005, including a possible 17-screen Regal Cinemas facility, but that element was not built as planned. In 2008, Station presented a smaller and more phased concept. The first phase would have included a 201-room hotel, casino, restaurants, cinema, and approximately 190,000 square feet of retail space, while a later phase could have added 525 rooms. Bowling and bingo facilities were removed from the revised concept. Construction was targeted for 2009, with an opening in 2011, but the Great Recession made the schedule untenable. The project was delayed indefinitely in late 2008, and Station Casinos filed for bankruptcy in 2009. The company retained the land rather than abandoning the long-term opportunity. Red Rock Resorts returned to the site during a new period of growth in the Las Vegas Valley. By 2019, the company emphasized the parcel's Beltway visibility, access, and distance from competing major casinos. Planning accelerated during 2020, and in May 2021 Red Rock announced that construction would begin in early 2022. County approval for the renewed project was obtained in October 2021. The resort was built on approximately 50 acres, with other portions of the property made available for residential development. A ceremonial groundbreaking took place on March 11, 2022, after site work had begun. Friedmutter Group designed the resort, and W.A. Richardson Builder LLC served as general contractor. The hotel tower was topped out in October 2022. The finished design uses desert references and introduces substantial daylight to the gaming floor through windows, distinguishing the property from many conventional casino interiors. Durango opened on December 5, 2023, two weeks later than initially expected. The delay was attributed to the need for additional preparation and employee training in parts of the resort. The opening marked Station Casinos' first newly built Las Vegas-area hotel-casino since Aliante Station opened in 2008 and signaled the beginning of a renewed development cycle for the company. The operating resort includes 209 hotel rooms, 29 suites, an 83,178-square-foot casino, a 10,000-square-foot sportsbook, food-hall and restaurant concepts, approximately 20,000 square feet of convention space, an event lawn, and 40 electric-vehicle charging stations. A south-side expansion began in January 2025, with additional casino space and a second parking garage planned. A separate future expansion has been described as adding more gaming and dining facilities on the north side, while bowling and cinema amenities remain outside the initial resort program.
- 2025
South-side expansion begins
[1]Work began on an expansion intended to add casino space and a second parking garage.
- 2023
Durango opens
[1]Durango opened to the public on December 5, becoming Station Casinos' first new Las Vegas hotel-casino since 2008.
- 2022
Groundbreaking and construction
[1]Station Casinos and Red Rock Resorts held a groundbreaking ceremony, beginning the construction phase of the revived project.
- 2021
Red Rock Resorts confirms project revival
[1]Red Rock Resorts announced that construction would proceed on a revised Durango hotel-casino.
- 2008
Scaled-down development plan released
[1]Station outlined a phased resort with a 201-room tower, casino, restaurants, cinema, and retail space.
- 2008
Project delayed during the Great Recession
[1]Worsening economic conditions caused Station to postpone construction indefinitely.
- 2004
Large Durango Station proposal announced
[1]Station proposed a major hotel-casino, triggering opposition from nearby residents over scale, traffic, and proximity to a planned school.
- 2004
Clark County approves the project with a gaming cap
[1]The county approved the project while limiting gaming space to 120,000 square feet.
- 2000
Station Casinos acquires the Durango site
[1]Station Casinos purchased 51 acres from developer Jim Rhodes for less than $37 million and began holding the property for future development.
Products and positioning
An upscale, design-led locals resort serving southwest Las Vegas, combining neighborhood accessibility with the amenities of a full-service casino hotel.
Gaming · 2023
Casino
Durango's main casino occupies approximately 83,178 square feet and offers land-based gaming in a design that incorporates windows and natural light. The gaming program is aimed primarily at local Las Vegas customers while also serving hotel guests and visitors from the wider valley.
Sports betting · 2023
Sportsbook
The resort includes a roughly 10,000-square-foot sportsbook with indoor and outdoor areas, supported by an adjacent sports lounge for viewing and social use.
Hospitality · 2023
Hotel
The 15-story hotel tower contains 209 rooms, including 29 suites. The accommodation offer extends Durango beyond a neighborhood casino and supports leisure, gaming, event, and business demand.
Food hall · 2023
Eat Your Heart Out
Eat Your Heart Out is a food hall containing 11 dining concepts. It forms one of the resort's principal public-facing attractions and gives the property a broad range of casual food and beverage options.
Restaurant · 2023
Summer House
Summer House is a California-themed restaurant operated by Lettuce Entertain You Enterprises. Its Durango location represented the operator's first off-Strip Las Vegas venue after a long presence in the market.
Events and conventions · 2023
Meetings and events
Durango provides approximately 20,000 square feet of convention space, together with an event lawn and resort dining and accommodation. These facilities broaden the property beyond gaming and support corporate, private, and social events.
Brand decisions
2025
Expand gaming and parking capacityStrategyBackground
The operating resort required additional capacity as the southwest Las Vegas market continued to develop.
Action taken
Construction began on a south-side expansion adding casino space and a second parking garage.
Aftermath
A further northern expansion has also been described, with additional gaming and dining facilities planned for a later phase.
Reported south-side expansion cost. $116 million (2025 expansion)
2023
Open Durango as a new-generation Station resortProduct launchBackground
Station Casinos had not opened a new Las Vegas hotel-casino since Aliante Station in 2008.
Action taken
The company launched Durango with a casino, sportsbook, hotel, restaurants, food hall, meeting facilities, and event space.
Aftermath
Durango became the first property in Station Casinos' renewed Las Vegas expansion program.
2021
Restart development at the Durango siteStrategyBackground
Red Rock Resorts identified the site's Beltway visibility, accessibility, and location in an underserved growth area as reasons to revive the project.
Action taken
Red Rock Resorts approved a new construction program and announced that work would begin in early 2022.
Aftermath
Construction proceeded, culminating in the resort's December 2023 opening.
Reported initial development budget. $750 million (2021 announced plan)
2008
Scale back and phase the projectStrategyBackground
The original concept faced community resistance and increasingly difficult economic conditions.
Action taken
Station reduced the initial hotel program to 201 rooms, removed bowling and bingo facilities, and proposed a phased mix of gaming, dining, cinema, and retail.
Aftermath
The Great Recession prevented construction, and the project was delayed indefinitely.
2004
Pursue a large neighborhood hotel-casinoStrategyBackground
Station Casinos sought to develop its landholding in a growing southwest Las Vegas market, initially proposing a hotel-casino of up to 1,000 rooms and substantial gaming space.
Action taken
The company submitted the Durango Station proposal and pursued county approval despite organized opposition from nearby residents.
Aftermath
Clark County approved the project but capped gaming space at 120,000 square feet. The controversy contributed to later county discussions about neighborhood-casino rules.
Sources2 sources
Cite this profile: Cite the canonical profile. /brand-wiki/durango-casino-and-resort · Editorial policy · How profiles are compiled