Skip to content

Copperbelt Energy Corporation

Copperbelt Energy Corporation is a Zambian power company involved in electricity generation, transmission, distribution, supply, and regional power development.

Last updated August 26, 2026

AI crawler reads

No AI crawler has read this profile since Oct 28, 2026.

Overview

Copperbelt Energy Corporation Plc, commonly known as CEC, is a Zambian electricity company whose principal business is supplying power to mining customers and developing energy infrastructure in Southern and West Africa. The company emerged in 1997 from the privatization of the power division of Zambia Consolidated Copper Mines, but its institutional roots extend back to the power organizations created during the colonial-era development of the Copperbelt mining industry. CEC is listed on the Lusaka Securities Exchange under the symbol CECZ. In Zambia, CEC operates a specialized electricity transmission and supply network serving major mining customers in the Copperbelt. The network described in reference material includes approximately 246 kilometres of 220-kilovolt lines and 678 kilometres of 66-kilovolt lines. CEC purchases much of the electricity it supplies from ZESCO, Zambia's national power utility, and transmits and distributes that power to mining companies. The business is therefore positioned between wholesale generation and industrial end users, with a particular emphasis on reliability, high-voltage infrastructure, and the operational requirements of mines. Historical reference material states that CEC supplied 4,208 GWh to customers in 2014, equivalent to approximately 29 percent of Zambia's total electricity generation in that year. The company also maintains emergency generation capacity for its Zambian mining customers. Its gas-turbine installations at Luano, Maclaren, Kankoyo, and Bancroft were described as comprising six units with an aggregate installed capacity of 80 MW. CEC owns the Zambian portion of the 220-kilovolt Zambia-Democratic Republic of the Congo interconnector, which supports electricity supply to mining customers in Katanga and has been associated with plans to expand transfer capacity. CEC is also a member of the Southern African Power Pool and participates in regional electricity trading and wheeling. CEC has progressively diversified beyond its historical transmission and mining-supply role. In Nigeria, it expanded through investments connected with Abuja Electricity Distribution Company and North South Power. Its Nigerian interests have linked it to electricity distribution across Abuja and the states of Niger, Kogi, and Nasarawa, as well as to the operation of the Shiroro hydroelectric facility through a long-term concession held by North South Power. The precise ownership interests described in the reference material are 45 percent in Abuja Electricity Distribution Company through KANN Utility and 20 percent in North South Power. The company has also pursued projects in Namibia and Sierra Leone. In Namibia, CEC has been associated with development of a large gas-to-power project with NamPower and Kudu Power, as well as a hybrid generation project at Arandis through a 60 percent interest in Arandis Power. In Sierra Leone, it signed a power purchase agreement concerning a proposed 128 MW thermal power project with a long-term operating concession. Renewable energy has become another area of development. CEC commissioned the 34 MW Zambia Riverside Solar Power Station at Riverside in Kitwe in 2023. In February 2024, it reported development of the 60 MW Itimpi Solar Power Station in the Itimpi area of Kitwe. These projects indicate an effort to add utility-scale solar capacity to a portfolio historically centered on grid infrastructure, mining demand, emergency generation, and regional power transactions. CEC's overall positioning is that of an industrial and regional power-infrastructure operator rather than a mass-market retail electricity brand.

History

Copperbelt Energy Corporation's history is closely connected with the development of the Copperbelt mining industry and the need to move electricity across mining regions in what are now Zambia and the Democratic Republic of the Congo. Its institutional lineage reaches back to the Northern Rhodesia Power Corporation, established in 1952. Around 1954, that organization became the Rhodesia-Congo Border Power Corporation. Its purpose was to improve the reliability and security of electricity supplied to mines by interconnecting separately operated thermal power stations in the two mining areas. Before the Kariba Dam became a major source of regional hydroelectricity, the organization also sourced and supplied hydroelectric power from the Congo to mines in Northern Rhodesia. Following Zambia's independence in 1964, the Rhodesia-Congo Border Power Corporation was renamed Copperbelt Power Company. It continued supplying electricity to the mines and became an important part of the power system supporting Zambia's principal industrial region. In 1986, the company was incorporated into Zambia Consolidated Copper Mines as its Power Division. This arrangement reflected the close relationship between the country's copper-mining sector and its electricity infrastructure: the power business existed largely to serve the mines and their associated industrial loads. CEC was created in 1997 through the privatization of the ZCCM Power Division. Cinergy Global Power of the United States and National Grid of the United Kingdom acquired the controlling interest during the privatization process. The company was subsequently transferred to a group of Zambian entrepreneurs, who acquired the two investors' 77 percent stake. This change moved the power business from direct state-linked mining ownership toward an independently owned commercial utility structure. In January 2008, Copperbelt Energy Corporation became the first Zambian power utility to list on the Lusaka Stock Exchange. Its listed status provided a local capital-markets presence while the company continued to focus on transmission, electricity supply, and the needs of industrial customers. The company has been described as the only listed Zambian power utility in the relevant historical reference material. CEC's Zambian operating model has centered on purchasing electricity from ZESCO and moving it through its own high-voltage network to mining customers in the Copperbelt. The network includes 220-kilovolt and 66-kilovolt lines, and the company has also operated gas-turbine units to provide emergency power. Its ownership of the Zambian section of the Zambia-DRC interconnector has supported cross-border supply to mining customers in Katanga. Through membership in the Southern African Power Pool, CEC has participated in regional power trading and wheeling, extending its role beyond a single-customer or single-site electricity supplier. Beginning in the 2010s, CEC expanded internationally and broadened its activities beyond transmission. In 2013, it entered Nigeria through KANN Utility and investments associated with Abuja Electricity Distribution Company. It also purchased an interest in North South Power, which holds a long-term concession to operate the 600 MW Shiroro hydroelectric power station in Niger State. The Nigerian investments gave CEC exposure to electricity distribution and generation operations in a much larger power market. The company later pursued development opportunities in Namibia and Sierra Leone. In Namibia, it entered a joint development arrangement with NamPower and Kudu Power for a proposed combined-cycle gas-to-power project and held an interest in Arandis Power, a developer of a hybrid heavy-fuel-oil and renewable generation plant. In Sierra Leone, CEC signed a power purchase agreement concerning a proposed 128 MW thermal power project under a long-term concession structure. CEC has also begun adding solar generation to its portfolio. The Zambia Riverside Solar Power Station, a 34 MW plant at Riverside in Kitwe, was commissioned in 2023. In February 2024, the company reported that it was developing a further 60 MW solar facility at Itimpi in Kitwe. These developments represent a gradual evolution from the company's historical identity as a mining-focused transmission and electricity-supply operator toward a diversified regional power company with interests in generation, renewable energy, distribution, and cross-border electricity infrastructure.

  • 2024

    Itimpi solar project enters development

    [1]

    CEC reported development of a 60 MW solar power station in the Itimpi area of Kitwe.

  • 2023

    Zambia Riverside Solar Power Station is commissioned

    [1]

    CEC commissioned a 34 MW solar plant at Riverside in Kitwe.

  • 2013

    Expansion into Nigeria

    [1]

    CEC entered Nigerian distribution and generation-related businesses through investments in KANN Utility, Abuja Electricity Distribution Company, and North South Power.

  • 2008

    CEC lists on the Lusaka Stock Exchange

    [1]

    CEC became the first Zambian power utility to list on the Lusaka Stock Exchange.

  • 1997

    CEC is created through privatization

    [1]

    Copperbelt Energy Corporation emerged from the privatization of the ZCCM Power Division, with Cinergy Global Power and National Grid initially acquiring control.

  • 1986

    Power division is incorporated into ZCCM

    [1]

    Copperbelt Power Company became the Power Division of Zambia Consolidated Copper Mines.

  • 1964

    Copperbelt Power Company succeeds the colonial-era entity

    [1]

    After Zambia's independence, the organization became Copperbelt Power Company and continued supplying electricity to the mines.

  • 1954

    Rhodesia-Congo Border Power Corporation is formed

    [1]

    The predecessor organization was renamed and focused on interconnecting power systems serving mines in Northern Rhodesia and the Congo.

  • 1952

    Northern Rhodesia Power Corporation is established

    [1]

    The institutional predecessor of CEC was established to support electricity supply in the Northern Rhodesian mining region.

Products and positioning

A mining-oriented electricity infrastructure and regional power company focused on reliable industrial supply, transmission networks, power trading, and expansion into generation and renewable energy.

  • Electricity transmission and industrial supply

    Copperbelt transmission and electricity supply network

    CEC owns and operates a high-voltage electricity network in Zambia's Copperbelt region. The network has been described as including 246 kilometres of 220 kV lines and 678 kilometres of 66 kV lines. CEC purchases electricity, principally from ZESCO, and supplies it through this infrastructure to mining customers. The offering is designed around the large and reliability-sensitive electricity demand of industrial mining operations.

  • Power generation

    Emergency gas-turbine generation

    CEC operates emergency generation assets serving its Zambian mining customers. Reference material identifies six gas-turbine generators located at Luano, Maclaren, Kankoyo, and Bancroft, with a combined installed capacity of 80 MW. These units provide backup or emergency power support when grid supply is constrained or interrupted.

  • Cross-border electricity infrastructure

    Zambia-DRC interconnector

    CEC owns the Zambian portion of a 220 kV interconnector linking Zambia with the Democratic Republic of the Congo. The line supports electricity supply to mining customers in Katanga Province. Historical plans described an upgrade from approximately 250 MW of capacity toward a dual-circuit configuration with substantially higher transfer capability.

  • Solar power generation · 2023

    Zambia Riverside Solar Power Station

    The Zambia Riverside Solar Power Station is a 34 MW solar power plant at Riverside in Kitwe. Commissioned in 2023, it represents CEC's expansion into utility-scale renewable generation and adds solar capacity to a portfolio historically dominated by network operations and mining-related electricity supply.

  • Solar power generation · 2024

    Itimpi Solar Power Station

    Itimpi Solar Power Station is a planned 60 MW solar project in the Itimpi area of Kitwe. CEC reported the project as under development in February 2024. The project is part of the company's effort to expand renewable generation in Zambia.

  • Electricity distribution · 2013

    Abuja Electricity Distribution Company investment

    Through KANN Utility, CEC has held an interest in Abuja Electricity Distribution Company. AEDC's distribution franchise covers the Federal Capital Territory of Abuja and the Nigerian states of Niger, Kogi, and Nasarawa, serving residential, commercial, and industrial electricity customers in those territories.

  • Hydroelectric generation · 2013

    Shiroro hydroelectric concession investment

    CEC holds an investment in North South Power, which has a 30-year concession to operate the 600 MW Shiroro Hydroelectric Power Station in Niger State, Nigeria. The investment gives CEC exposure to large-scale hydroelectric generation and complements its distribution and transmission activities.

Brand decisions

  • 2024

    Develop the Itimpi solar projectProduct launch

    Background

    CEC continued developing renewable generation in the Kitwe area after commissioning the Riverside solar plant.

    Action taken

    CEC reported that a 60 MW solar power station was under development at Itimpi.

    Aftermath

    The project remained under development in the cited reference material; an operating date was not specified.

  • 2023

    Commission utility-scale solar generation at RiversideProduct launch

    Background

    CEC was expanding from transmission and mining-focused electricity supply into owned generation and renewable energy.

    Action taken

    The company commissioned the 34 MW Zambia Riverside Solar Power Station in Kitwe.

    Aftermath

    The project added operating solar generation capacity to CEC's Zambian portfolio.

  • 2013

    Enter Nigeria through distribution and generation investmentsM&A

    Background

    CEC sought to diversify geographically and broaden its activities beyond its Zambian mining-customer network.

    Action taken

    CEC acquired a 75 percent stake in KANN Utility, linked to Abuja Electricity Distribution Company, and purchased a 20 percent interest in North South Power.

    Aftermath

    The transactions gave CEC exposure to electricity distribution in four Nigerian territories and to the Shiroro hydroelectric concession.

  • 2008

    List the company on the Lusaka Stock ExchangeStrategy

    Background

    CEC sought to operate as a commercial Zambian utility following the privatization of the former ZCCM power division.

    Action taken

    CEC listed on the Lusaka Stock Exchange in January 2008.

    Aftermath

    The listing gave the company a local public-market presence and established it as the first listed Zambian power utility described in the reference material.

  • 1997

    Create an independent commercial power company through privatizationStrategy

    Background

    The power business had operated within Zambia Consolidated Copper Mines after the former Copperbelt Power Company was absorbed into ZCCM in 1986.

    Action taken

    The ZCCM Power Division was privatized and reorganized as Copperbelt Energy Corporation, initially bringing in Cinergy Global Power and National Grid as controlling investors.

    Aftermath

    CEC became a standalone power-infrastructure company and later transferred the investors' 77 percent stake to local Zambian entrepreneurs.

Sources1 sources

Cite this profile: Cite the canonical profile. /brand-wiki/copperbelt-energy-corporation · Editorial policy · How profiles are compiled