Skip to content

ConverDyn

ConverDyn is a General Atomics–Honeywell partnership that markets uranium hexafluoride conversion services from the Honeywell Metropolis Works facility.

Last updated November 4, 2026

AI crawler reads

No AI crawler has read this profile since Oct 28, 2026.

Overview

ConverDyn is a general partnership between General Atomics and Honeywell serving the front end of the commercial nuclear-fuel cycle. Its principal role is the marketing and sale of uranium hexafluoride (UF6) produced at the Honeywell Uranium Hexafluoride Processing Facility, commonly known as Metropolis Works, in Metropolis, Illinois. The facility converts uranium ore concentrate, often called yellowcake, into UF6, the chemical form required for enrichment before the material can be fabricated into nuclear fuel for electricity-generating reactors. The partnership was formed in 1992 by AlliedSignal and General Atomics. At the time, the United States had two operating UF6-conversion facilities: AlliedSignal's Metropolis Works plant in Illinois and General Atomics' Sequoyah Fuels facility in Gore, Oklahoma. Both companies anticipated difficult market conditions caused by low conversion prices and the expected availability of additional uranium-related material under the Megatons to Megawatts program. They agreed to close the Gore facility and share equally in the profits from the Metropolis operation. ConverDyn became the joint marketing organization for UF6 manufactured there, meaning that production from the plant was marketed and sold through the partnership. The corporate structure changed in 1999 when Honeywell merged with AlliedSignal. Honeywell consequently replaced AlliedSignal as the partner associated with Metropolis Works, while the partnership with General Atomics continued. ConverDyn is therefore not primarily a consumer-facing product brand; it is a specialized business-to-business organization whose customers are utilities and other participants in the nuclear-fuel supply chain. Metropolis Works was built in 1958 and is described as the only uranium hexafluoride conversion facility in the United States. Reference material identifies an annual conversion capacity of approximately 15,000 metric tons of uranium as UF6, equivalent to roughly one-fifth of global conversion capacity at the time of the cited description. The plant receives uranium concentrates from mining operations and produces UF6 gas, which is subsequently transported to enrichment facilities. Enriched uranium can then be converted into nuclear-fuel products used in power reactors. The plant uses Honeywell's dry fluoride volatility conversion process. Unlike conversion routes that divide the work between separate facilities, this process is designed to take yellowcake through to UF6 at one site. The sequence includes feed preparation, reduction to uranium dioxide, hydrofluorination to uranium tetrafluoride, fluorination to crude UF6, and distillation. The cited material describes the process as producing UF6 with a purity of at least 99.99 percent. Its integrated design and purification capabilities are central to the technical proposition associated with the Metropolis operation. Following the 2011 Fukushima Daiichi nuclear disaster, the United States Nuclear Regulatory Commission conducted broader inspections of nuclear facilities for resilience against earthquakes, tornadoes, and other natural hazards. Although the Metropolis facility was initially described as compliant with its operating license, the NRC required additional upgrades and the plant was shut down in May 2012. Honeywell chose to undertake the required work, and production restarted in July 2013 after more than a year offline. This episode illustrates the importance of regulatory compliance, physical resilience, and continuity of supply to ConverDyn's business. ConverDyn's market position is therefore based on specialized nuclear-material conversion, access to the Metropolis facility, and its role as the sole marketing agent for that plant's UF6 output. Its relevance extends beyond the United States because enriched uranium supply chains connect North American production with enrichment and reactor-fuel operations in several regions. Publicly available reference material provides limited information about ConverDyn's personnel, financial performance, customer contracts, or activities beyond the marketing of Metropolis-produced UF6.

History

ConverDyn emerged from restructuring in the United States uranium-conversion industry during the early 1990s. Between 1970 and 1992, two American facilities converted uranium materials into uranium hexafluoride: AlliedSignal's Metropolis Works facility in Illinois and General Atomics' Sequoyah Fuels facility in Gore, Oklahoma. Market conditions were becoming difficult for conversion operators. Prices were low, and the implementation of the Megatons to Megawatts program was expected to increase the availability of uranium-related material and intensify pressure on conversion economics. In 1992, AlliedSignal and General Atomics agreed to close the Gore facility and cooperate around the Metropolis plant. They established ConverDyn as a general partnership and gave it responsibility for marketing the UF6 produced at Metropolis Works. The arrangement provided joint and equal participation in profits from the Illinois operation while consolidating the companies' commercial activity around one remaining U.S. conversion site. Under this structure, UF6 produced at Metropolis Works was marketed and sold through ConverDyn. The Metropolis facility itself dates to 1958. It processes uranium ore concentrate, commonly known as yellowcake, into UF6 gas. UF6 is an intermediate material in the nuclear-fuel cycle: it can be transported to an enrichment plant, where the concentration of uranium-235 is increased, and the enriched material can then be fabricated into reactor fuel. The plant's importance derives from its specialized conversion function and its position as the only uranium hexafluoride conversion facility in the United States described in the reference material. Honeywell developed the plant's dry fluoride volatility process. The process integrates the conversion of yellowcake to UF6 in one facility rather than relying on separate sites for intermediate uranium compounds and final fluorination. Feed preparation establishes suitable material characteristics; reduction converts uranium oxide concentrate into uranium dioxide; hydrofluorination produces uranium tetrafluoride, also called green salt; fluorination reacts that intermediate with fluorine to create crude UF6; and distillation purifies the product before it is placed into cylinders for transport. The cited description states that the resulting UF6 can reach purity of 99.99 percent or higher. A corporate change occurred in 1999 when Honeywell and AlliedSignal merged. Honeywell thereby became the corporate partner connected with the Metropolis operation, while General Atomics remained the other participant in the ConverDyn partnership. The marketing role continued under the ConverDyn name. The next major operational event followed the Fukushima Daiichi disaster in 2011. The U.S. Nuclear Regulatory Commission reviewed nuclear facilities for resistance to severe natural events. Although the Metropolis facility was initially reported to be in compliance with its operating license, the regulator required additional work to address resilience concerns. The plant was shut down in May 2012 while Honeywell completed the required upgrades. Production restarted in July 2013, more than a year after the closure. The available reference material presents ConverDyn as a narrowly focused industrial organization rather than a diversified energy company. Its principal commercial identity is tied to the marketing of Metropolis-produced UF6 for nuclear utilities and other fuel-cycle participants in North America, Europe, and Asia. Public sources cited here do not provide a detailed account of its executive team, revenue, ownership percentages beyond the partnership relationship, customer list, or later corporate developments.

  • 2013

    UF6 production restarts

    [1]

    Metropolis Works resumes uranium hexafluoride production in July after completing the required upgrades.

  • 2012

    Metropolis Works is shut down for mandated upgrades

    [1]

    The facility is taken offline after the NRC requires improvements related to resilience against natural disasters.

  • 1999

    Honeywell becomes the AlliedSignal partner

    [1]

    Honeywell's merger with AlliedSignal results in the partnership structure involving Honeywell and General Atomics.

  • 1992

    ConverDyn is formed

    [1]

    AlliedSignal and General Atomics establish ConverDyn as a general partnership after agreeing to close the Sequoyah Fuels facility and consolidate commercial activity at Metropolis Works.

  • 1958

    Metropolis Works is built

    [1]

    The facility that later became the Honeywell Metropolis Works uranium hexafluoride conversion plant is constructed in Illinois.

Products and positioning

A specialized business-to-business provider and exclusive marketer of uranium hexafluoride produced at the Honeywell Metropolis Works facility, positioned within the commercial nuclear-fuel conversion and supply chain.

  • Nuclear-fuel-cycle service

    Uranium hexafluoride conversion

    ConverDyn markets conversion of uranium ore concentrate into uranium hexafluoride at Honeywell Metropolis Works. The process prepares material for shipment to uranium-enrichment facilities, after which enriched uranium may be fabricated into fuel for nuclear power reactors. The facility uses an integrated dry fluoride volatility process involving reduction, hydrofluorination, fluorination, and distillation.

  • Industrial nuclear material

    Uranium hexafluoride

    UF6 produced at Metropolis Works is ConverDyn's principal marketed output. The cited reference describes the plant as producing purified UF6 at 99.99 percent or higher purity and identifies ConverDyn as the sole marketing agent for material produced at the facility.

Brand decisions

  • 2012

    Upgrade and temporary shutdown of Metropolis WorksOther

    Background

    Following post-Fukushima inspections, the NRC required additional measures to improve the facility's resistance to earthquakes, tornadoes, and other natural hazards.

    Action taken

    Honeywell took the plant offline in May 2012 and undertook the required upgrades.

    Aftermath

    Production restarted in July 2013 after more than a year of shutdown.

  • 1992

    Consolidation around Metropolis WorksStrategy

    Background

    AlliedSignal and General Atomics faced low uranium-conversion prices and anticipated additional supply pressure associated with the Megatons to Megawatts program.

    Action taken

    The companies closed the Sequoyah Fuels facility, formed ConverDyn, and concentrated UF6 marketing and production economics around Metropolis Works.

    Aftermath

    ConverDyn became the sole marketing organization for UF6 produced at the Illinois facility.

Sources1 sources

Cite this profile: Cite the canonical profile. /brand-wiki/converdyn · Editorial policy · How profiles are compiled