Overview
Cikarang Listrindo is an Indonesian company that commenced operations in 1993 and describes itself as the longest operating Private Power Utility (PPU) in Indonesia. It serves PLN and the five Industrial Estates, and reports conventional power plant installed capacity of 1,144 MW and solar power generation capacity of 45.7 MWp. It is the first private power company listed on the Indonesia Stock Exchange.
History
Cikarang Listrindo commenced its operations in 1993. In 1993, the first two GE Frame 6B gas turbines were installed, providing a plant capacity of 60 MW. In 1996, the company added another four GE Frame 6B gas turbines and increased capacity to 180 MW. In 1998, it added two Mitsubishi steam turbines, each capable of delivering 60 MW, and by building two combined-cycle blocks, total capacity reached 300 MW. In 2000, Cikarang Listrindo was awarded ISO 9001 Quality Management System certification. In 2006, a GE Frame 9E gas turbine was added, delivering 109 MW and increasing total capacity to 409 MW. In 2009, after adding another GE Frame 9E gas turbine, total capacity reached 518 MW. The company describes itself as the longest operating Private Power Utility (PPU) in Indonesia and the first private power company listed on the Indonesia Stock Exchange.
Products and positioning
The Pioneer Private Power Utility for Industrial Estates
Product categories. Electricity supply to PLN · Electricity supply to industrial estates
Sources5 sources