China Nuclear Power Engineering Co., Ltd.
A specialized nuclear power engineering and project management company and a major member unit of China General Nuclear Power Group (CGN).
Last updated September 15, 2026
AI crawler reads
No AI crawler has read this profile since Oct 28, 2026.
Overview
China Nuclear Power Engineering Co., Ltd. (中广核工程有限公司) is a major member unit of China General Nuclear Power Group (CGN) with about 6,300 employees. Founded in February 2004 in Shenzhen, it describes itself as China's first specialized nuclear power engineering management company. It positions itself as a specialized AE (Architect Engineering) company aiming to become a world-class AE company, with a '1+2+3' business layout centered on nuclear engineering, with offshore wind engineering and decommissioning engineering as strategic businesses, and market-oriented engineering capability, pumped storage, and design or engineering management consulting as synergistic businesses. It states it has built and put into operation 31 nuclear power units with a total installed capacity of 35.448 million kW, and as of September 2026 has 21 nuclear power units under construction with a total installed capacity of 25.396 million kW. It also states it has completed 11 offshore wind projects with an installed capacity of 3.922 million kW.
History
China Nuclear Power Engineering Co., Ltd. was founded in February 2004 in Shenzhen and describes itself as China's first specialized nuclear power engineering management company. Its development history lists: 2004 establishment of CGN Engineering; 2005 establishment of Shenzhen CGN Engineering Design Co., Ltd. and start of Ling'ao Phase II main works; 2008 integrated operation of the engineering company and design company; 2011 full completion of Ling'ao Phase II achieving 'four autonomies'; 2014 successful development of the independently owned third-generation nuclear technology 'Hualong One'; 2015 start of construction of the CGN 'Hualong One' demonstration project, Guangxi Fangchenggang Phase II; 2018 first EPR unit at Taishan put into operation and entry into offshore wind engineering; 2019 start of construction of the first 'Hualong One' fusion project, Guangdong Taipingling Phase I; and 2020 passing of the European Utility Requirements (EUR) certification for 'Hualong One'.
Products and positioning
Specialized AE (Architect Engineering) company; nuclear power station system integrator and nuclear-specific technical service provider; aspiring world-class AE company.
Hualong One (华龙一号)
Third-generation nuclear power technology with independent intellectual property rights, developed by the company; described as the only Chinese nuclear power technology brand to have passed IAEA safety review, UK Generic Design Assessment (GDA), and European Utility Requirements (EUR) certification.
CPR1000
CGN's own-brand nuclear power project type built on a standardized, large-scale basis.
Sources5 sources