Skip to content

Bujumbura Slaughterhouse Management Company

A Burundian private company that took over and operates the former Bujumbura Public Slaughterhouse.

Last updated August 31, 2026

AI crawler reads

No AI crawler has read this profile since Oct 28, 2026.

Overview

Bujumbura Slaughterhouse Management Company, known in French as Société de Gestion de l'Abattoir de Bujumbura and commonly abbreviated SOGEAB, is a Burundian company involved in the operation and modernization of slaughterhouse infrastructure. Its business developed from the former Bujumbura Public Slaughterhouse, or Abattoir Public de Bujumbura (APB), a state-managed facility established in 1958. The company assumed the APB's assets when the public slaughterhouse was privatized in 2010 as part of Burundi's wider public-enterprise reform program. The original facility occupied approximately 16,800 square metres in Bujumbura. It included administrative areas, vehicle parking, animal holding and movement corridors, slaughtering and bleeding rooms, dressing and evisceration areas, a skinning area, cold storage, an incinerator and related service spaces. Water and electricity were supplied by REGIDESO, Burundi's public utility. The site processed cattle, small ruminants and pigs for the urban meat supply and also supplied the AFRITAN tannery with animal hides. The public abattoir had significant throughput. During the 2009 financial year, before the transfer to SOGEAB, it processed 26,215 cattle, 54,339 small ruminants and 6,205 pigs. However, Bujumbura's urban expansion gradually surrounded the facility, increasing concerns about sanitation, waste management and public health. The existing layout and equipment were also considered inadequate for professional and humane slaughter. Wastewater and blood were routed to a pit through shared channels, while visceral contents were deposited behind the principal building, illustrating the infrastructure constraints that the private operator inherited. By 2018, the original plant was reportedly capable of slaughtering about 100 cattle per day on average but could no longer meet demand from local butchers. SOGEAB therefore began developing a larger, modern abattoir in Muzinga, in Bubanza Province. The project became more feasible after the area was connected to the electricity grid, allowing the planned facility to use powered refrigeration and improve carcass preservation. The new plant was expected to process at least 200 animals per day. The Muzinga project was designed with technical guidance from the Food and Agriculture Organization of the United Nations. Its planned features included better-drained premises, proximity to a transport route and covered animal pens with drinking water so livestock could rest before slaughter. The project also envisioned using more of the animal by-products: hides for leather manufacturing, horns for everyday goods, blood for blood meal used in livestock and poultry feed, and digestive contents for biogas and compost. In this respect, SOGEAB's development strategy extended beyond basic slaughtering toward improved cold-chain management, sanitation and by-product utilization. SOGEAB is therefore best understood as an infrastructure and meat-processing services company rather than a consumer-facing packaged-food brand. Publicly available reference material does not identify a separate retail product portfolio, a listed shareholding, a corporate website, named executives or operations outside Burundi. Its principal significance lies in the privatization and attempted modernization of a strategically important municipal slaughterhouse serving Bujumbura and surrounding meat-market users.

History

The company's history is rooted in the Bujumbura Public Slaughterhouse, an abattoir built in 1958. The public facility was established to provide organized slaughtering capacity for the capital's meat supply. It occupied around 16,800 square metres and contained the principal spaces required for livestock processing, including animal corridors, slaughtering and bleeding rooms, dressing and evisceration areas, a skinning section, cold storage, an incinerator and administrative facilities. The plant handled cattle, small ruminants and pigs and was connected to the municipal water and electricity provider, REGIDESO. The APB operated as an autonomous organization under Burundi's Ministry of Agriculture and Livestock. It was also economically connected to other parts of the country's livestock and leather economy: among its customers or downstream partners was AFRITAN, a tannery that received hides from the slaughterhouse. In 2009, the facility processed 26,215 cattle, 54,339 small ruminants and 6,205 pigs, demonstrating its importance to the Bujumbura market before privatization. The facility nevertheless faced serious structural and environmental limitations. As Bujumbura expanded, urban development increasingly surrounded the slaughterhouse. Its location and waste arrangements created public-health and hygiene concerns. Blood and wastewater were directed to a pit through the same channels, and visceral material was discarded behind the main building. The available equipment and internal layout were also regarded as insufficient for consistently professional and humane slaughtering. The APB became one of 14 public enterprises targeted by Burundi's 2006–2008 privatization program, which was supported by a World Bank Economic Reform Support Grant. The privatization was completed in 2010. On 20 August 2010, the assets of the public slaughterhouse were transferred from the State of Burundi to Société de Gestion de l'Abattoir de Bujumbura, or SOGEAB. The private company was formed by ten businesspeople, including people who had previously managed or worked at the public facility. This gave the new operator continuity of operational knowledge while changing the legal and ownership framework. The inherited plant continued to serve local butchers, but its capacity became increasingly inadequate. By 2018, the abattoir was reported to be able to slaughter approximately 100 cattle per day on average, a level that no longer met local demand. SOGEAB responded by beginning construction of a modern facility in Muzinga, Bubanza Province. The project benefited from the extension of the electricity grid to the location, because reliable power was needed for a cooling system capable of preserving carcasses. The planned abattoir was expected to handle at least 200 animals per day, approximately doubling the cited cattle-processing capacity of the older site. The Muzinga facility was planned according to recommendations associated with the Food and Agriculture Organization of the United Nations. Its site was selected for drainage and transport advantages, and the design included covered holding pens with drinking water to allow animals to rest before slaughter. The project also incorporated a more circular approach to slaughterhouse operations. Hides were intended for leather production, horns for everyday products, blood for blood meal used in livestock and poultry feeding, and digestive material for biogas and compost. The reported project cost was approximately 5 billion Burundian francs, with the contemporary reference material giving an approximate US-dollar equivalent of US$2.6 million. Available information does not establish the project's completion date, the company's current production volume, the identity of its executives, or whether SOGEAB operates additional facilities. The documented record presents it primarily as a private operator and modernization vehicle for Burundi's principal Bujumbura-area slaughterhouse infrastructure.

  • 2018

    Modern Muzinga abattoir project begins

    [1]

    SOGEAB begins construction of a new abattoir in Muzinga, Bubanza Province, with planned capacity of at least 200 animals per day.

  • 2010

    Assets are transferred to SOGEAB

    [1]

    On 20 August, the assets of the state-owned Bujumbura Public Slaughterhouse are transferred to Société de Gestion de l'Abattoir de Bujumbura during Burundi's privatization program.

  • 2009

    Pre-privatization slaughter volumes are recorded

    [1]

    The public abattoir processes 26,215 cattle, 54,339 small ruminants and 6,205 pigs during the financial year.

  • 1958

    Bujumbura Public Slaughterhouse is built

    [1]

    The Bujumbura Public Slaughterhouse, the predecessor facility from which SOGEAB developed, is established.

Products and positioning

A Burundian abattoir operator focused on supplying urban meat markets while improving slaughter capacity, refrigeration, hygiene and the productive use of animal by-products.

  • Abattoir service

    Cattle slaughtering

    Processing services for cattle supplied to the Bujumbura-area meat market. The original public facility reportedly handled tens of thousands of cattle annually before privatization, while the later Muzinga project was planned to expand overall slaughtering capacity.

  • Abattoir service

    Small-ruminant slaughtering

    Slaughtering and carcass-processing services for small ruminants, including sheep and goats. The predecessor facility recorded substantial small-ruminant throughput in 2009, making this an established part of the site's operating role.

  • Abattoir service

    Pig slaughtering

    Slaughtering and processing of pigs at the Bujumbura abattoir. Pig processing formed a smaller but documented component of the former public facility's mixed-species operations.

  • Cold-chain service · 2018

    Cold storage and carcass preservation

    Refrigeration and cold-room functions intended to preserve carcasses after slaughter. The planned Muzinga facility specifically depended on grid electricity to operate improved cooling equipment and reduce deterioration between slaughter and distribution.

  • By-product processing · 2018

    Animal by-product recovery

    Planned recovery and processing of hides, horns, blood and organic digestive material. Proposed uses included leather goods, everyday horn products, blood meal for livestock and poultry feed, and biogas and compost from digestive contents.

Brand decisions

  • 2018

    Expansion through a modern Muzinga abattoirStrategy

    Background

    The existing facility was reported to handle about 100 cattle per day on average but could no longer satisfy demand from local butchers. Its urban setting and outdated infrastructure also created sanitation and operational constraints.

    Action taken

    SOGEAB began construction of a new facility in Muzinga, Bubanza Province, designed for at least 200 animals per day. The plan included electric refrigeration, covered livestock pens, improved drainage and systematic use of animal by-products.

    Aftermath

    The available reference material does not confirm completion, final cost, operating capacity or the project's current status.

    Estimated project cost. Approximately 5 billion BIF, reported at the time as about US$2.6 million (2018 project estimate)

  • 2010

    Privatization and asset transferM&A

    Background

    The Bujumbura Public Slaughterhouse was included among the public enterprises targeted by Burundi's 2006–2008 privatization program, supported by a World Bank economic reform grant.

    Action taken

    On 20 August 2010, the State transferred the public slaughterhouse's assets to SOGEAB, a private company formed by ten businesspeople, including former APB managers and employees.

    Aftermath

    SOGEAB became the private operator of the Bujumbura abattoir. The available source does not provide the transaction price or later ownership changes.

Sources1 sources

Cite this profile: Cite the canonical profile. /brand-wiki/bujumbura-slaughterhouse-management-company · Editorial policy · How profiles are compiled