Skip to content

Newport News Shipbuilding controversies

Controversies tied to this brand in public sources. A listing is not a finding of fault.

Back to profile2 entries

  1. 2009

    Improperly installed submarine weapons-system fasteners

    Bolts and fasteners in weapons-handling systems on four submarines were installed incorrectly. The defects delayed launches while the affected work was corrected.

  2. 2007

    Incorrect metal used in submarine pipe joints

    The Navy found that workers had used an incorrect metal to fuse pipes and joints on submarines under construction. The issue was considered capable of causing cracking and leaks and required corrective attention.