Lincoln Mall controversies
Controversies tied to this brand in public sources. A listing is not a finding of fault.
Back to profile1 entries
2013
Safety and building-code dispute
Matteson representatives pursued legal action concerning alleged safety and building-code violations at the mall. Reported issues included exposed electrical wiring, blocked fire exits, a malfunctioning sprinkler system, roof deterioration, and foundation damage. The dispute ultimately contributed to the court-ordered permanent closure of the enclosed mall.