Skip to content

Hitachi Rail Italy controversies

Controversies tied to this brand in public sources. A listing is not a finding of fault.

Back to profile5 entries

  1. 2017

    Washington Metro 4000-series retirement

    The Washington Metro 4000-series vehicles were retired after concerns that included an incorrect speed-limit display in manual mode, following earlier door-related incidents involving the fleet.

  2. 2016

    IC4 delivery and reliability problems

    The Danish IC4 programme missed its original delivery schedule by several years and experienced continuing technical problems. DSB announced a future withdrawal of the trains.

  3. 2013

    Fyra V250 reliability controversy

    The V250 trains supplied for the Dutch-Belgian Fyra service were delivered years late and suffered severe technical and reliability problems after entering service. NMBS/SNCB withdrew from the project and cancelled its contract.

  4. 2000

    Sirio tram performance concerns in Gothenburg

    Gothenburg reported late delivery and operational problems with Sirio trams, including corrosion, excessive track damage, air-conditioning malfunctions and poor ride quality.

  5. 2000

    Stockholm signalling contract dispute

    A delayed metro signalling project for Stockholm's red line was cancelled after years of work. The dispute over advance payments proceeded to arbitration.