Original Ghan
Construction of what was then known as the Port Augusta to Government Gums Railway began in 1878 when Premier of South Australia William Jervois broke ground at Port Augusta.[7] The line reached Hawker in June 1880, Beltana in July 1881, Marree in January 1884 and Oodnadatta in January 1891.[17] Work on the extension to Alice Springs began in 1926,[18] and was completed in 1929. Until then, the final leg of the train journey was still made by camel.[19]
Although there were plans from the beginning to extend the line to Darwin, by the time the extension to Alice Springs had been completed, The Ghan was losing money and the plans for further extension to Darwin were suspended indefinitely.[20] The original Ghan line followed the same track as the overland telegraph, which is believed to be the route taken by John McDouall Stuart during his 1862 crossing of Australia.[21]
The Ghan service was notorious for delays caused by washouts of the track. A flatcar immediately behind the locomotive carried spare sleepers and railway tools, so passengers and crew could repair the line. The very uncertain service via this route was tolerated because steam locomotives needed large quantities of water, and Stuart's route to Alice Springs was the only one that had sufficient available water.
Initially operated fortnightly, in the 1930s, it was increased to weekly. From 1956 until 1975, it operated twice weekly, before reverting to a weekly service.[22] During World War II, the service had to be greatly expanded, putting great pressure on the limited water supplies. As a result, de-mineralisation towers, some of which survive to this day, were built along the track so that bore water could be used. When a new line to Alice Springs was built in the 1970s, the use of diesel locomotives meant that there was far less need for water, thus allowing the line to take the much drier route from Tarcoola to Alice Springs.
The last narrow gauge service departed Alice Springs on 26 November 1980.[23]
New line
In October 1980, a new standard gauge line from Tarcoola on the Trans-Australian Railway to Alice Springs opened, and the train took the form it has today. The new line is approximately 160 km west of the former line in order to avoid floodplains where the original line was often washed away during heavy rain.[19] It was also hoped that the construction of the new line would improve the train's timekeeping.[20]
The first Ghan on the new line departed Adelaide on 11 December 1980.[24] It initially operated as a broad gauge service to Port Pirie. Following the conversion of the Adelaide to Crystal Brook to standard gauge in 1982, it operated as a standard gauge train throughout. Operating weekly, a second service was operated between May and October.[25][26]
Connection to Darwin
Construction of Alice Springs–Darwin line was believed to be the second-largest civil engineering project in Australia, and the largest since the creation of the Snowy Mountains Scheme.[33][34] Line construction began in July 2001, with the first passenger train reaching Darwin on 3 February 2004, after 126 years of planning and waiting[35][36] and at a cost of $1.3 billion.[37]
The Ghan's arrival in Darwin signified a new era of tourism in the Northern Territory,[38] making travel to the region easier and more convenient.[39]