TPP Nikola Tesla, commonly known as TENT, is a power plant complex operated by Elektroprivreda Srbije, located on the right bank of the river Sava, approximately 40 km upstream from Downtown Belgrade, near the city municipality of Obrenovac. By far the largest one in Serbia, the complex generates around 17,263 GWh annually, which covers almost half of Serbia's needs for electricity. The complex and two of its plants are named in honor of Nikola Tesla.
These power plants use lignite mined from the RB Kolubara as fuel. Coal is transported from the mines via a standard-gauge railroad about 30 km long capable of supplying a total of 37 million tons of coal a year.
Power plants
TPP Nikola Tesla A
Six generation units with a combined capacity of 1650.5 MW that makes it the largest power facility in the former Yugoslavia. TPP Nikola Tesla A was first synchronised on March 27, 1970. It has two chimneys: one with a height of 220 metres and a second with a height of 150 metres.