The Commercial Crew Program (CCP) provides commercially operatedcrew transportation service to and from the International Space Station (ISS) under contract to NASA, conducting crew rotations between the expeditions of the International Space Station program.The American space manufacturerSpaceX began providing service in 2020, using Crew Dragon, and NASA plans to add Boeing when Starliner becomes operational no earlier than 2026.NASA has contracted for six operational missions from Boeing and fourteen from SpaceX, ensuring sufficient support for ISS through 2030.[1]
The spacecraft are owned and operated by the vendor, and crew transportation is provided to NASA as a commercial service. Each mission sends up to four astronauts to the ISS. Operational flights occur approximately once every six months for missions that last for approximately six months. A spacecraft remains docked to the ISS during its mission, and missions usually overlap by at least a few days. Between the retirement of the Space Shuttle in 2011 and the first operational CCP mission in 2020, NASA relied on the Soyuz program to transport its astronauts to the ISS.
A Crew Dragon spacecraft is launched to space atop a Falcon 9 Block 5 launch vehicle and the capsule returns to Earth via splashdown in the ocean near Florida.The program's first operational mission, SpaceX Crew-1, launched on 16 November 2020.Boeing Starliner spacecraft will participate after its final test flight, launched atop an Atlas V N22 launch vehicle.Instead of a splashdown, a Starliner capsule will return on land with airbags at one of four designated sites in the western United States.
Development of the Commercial Crew Program began in 2011 as NASA shifted from internal development of crewed vehicles to perform ISS crew rotation to commercial industry development of transport to the ISS.A series of open competitions over the following two years saw successful bids from Boeing, Blue Origin, Sierra Nevada, and SpaceX to develop proposals for ISS crew transport vehicles. In 2014, NASA awarded separate fixed-price contracts to Boeing and SpaceX to develop their respective systems and to fly astronauts to the ISS. Each contract required four successful demonstrations to achieve human rating for the system: pad abort, uncrewed orbital test, launch abort, and crewed orbital test. Operational missions were initially planned to begin in 2017, with missions alternating between the two providers. Delays required NASA to purchase additional seats on Soyuz spacecraft up to Soyuz MS-17 until Crew Dragon missions commenced in 2020. Crew Dragon continues to handle all missions until Starliner becomes operational no earlier than 2026.
Background
In 2004, the Aldridge Commission – established by PresidentGeorge W. Bush following the Space Shuttle Columbia disaster – called for crewed flights to the Moon with a Crew Exploration Vehicle in its final report.[2][3] Following the NASA Authorization Act of 2005, the Constellation program was established,[4] which envisioned a revised Crew Exploration Vehicle named Orion conducting crew rotation flights to the International Space Station (ISS) in addition to its lunar exploration goals.[4][5][6] Orion superseded the Orbital Space Plane,[7][8] which was specifically designed for ISS crew rotation.[9] In 2009, the Augustine Commission appointed by President Barack Obama found that the program's funding and resources were insufficient to execute its goals without significant delays to its schedule and an increase of US$3 billion in funding,[10] which prompted NASA to start considering alternatives to the program.[11] The Constellation program was officially cancelled in 2010,[12] with NASA repurposing Orion for exploration beyond Earth,[13] and collaborating with commercial partners for ISS crew rotation and other crewed activities in low Earth orbit following the retirement of the Space Shuttle program in 2011.[12][14][15] This arrangement would additionally end NASA's dependency on Roscosmos' Soyuz program to deliver its astronauts to the ISS.[16][17]
Development
CCDev awards
The NASA Authorization Act of 2010 allocated US$1.3 billion for an expansion of the existing Commercial Crew Development (CCDev) program over three years.[12] While the program's first round of competition in 2010 focused on funding development of various human spaceflight technologies in the private sector as part of the American Recovery and Reinvestment Act,[18][19] its second round, CCDev 2, focused on proposals for spacecraft capable of shuttling astronauts to and from the ISS.[20][21] The competition for CCDev 2 funding concluded in April 2011,[21] with Blue Origin receiving US$22 million to develop its biconic nose cone capsule concept,[22]SpaceX receiving US$75 million to develop a crewed version of their Dragon spacecraft and a human-rated Falcon 9 launch vehicle,[23] the Sierra Nevada Corporation receiving US$80 million to develop the Dream Chaser,[24] and Boeing receiving US$92.3 million to develop the CST-100 Starliner.[24] SpaceX had previously been contracted by NASA to operate ISS resupply flights with their Dragon spacecraft, as part of NASA's Commercial Resupply Services.[25][26] The program's third round, Commercial Crew integrated Capability (CCiCap),[27] aimed to financially support the development of winning proposals over 21 months through to May 2014, in preparation for crewed missions to the ISS within five years.[27][28][29] Despite winning awards in CCDev 1 and CCDev 2, Blue Origin decided against competing in CCiCap, opting instead to rely on private investment from their owner, Jeff Bezos, to continue development on crewed spaceflight.[30][31] The competition for CCiCap funding ended in August 2012, with US$212.5 million allocated to Sierra Nevada's Dream Chaser, US$440 million allocated to SpaceX's Crew Dragon, and US$460 million allocated to Boeing's Starliner.[29][32][33] While Alliant Techsystems's integrated Liberty launch vehicle and spacecraft was a finalist, it was rejected due to concerns about the lack of detail in Alliant Techsystems's proposal.[34]
In December 2012, the three CCiCap winners were each given an additional USD$10 million in funding as the first of two series of "certification products contracts" (CPC) to allow for further testing, engineering standards, and design analysis to meet NASA's safety requirements for crewed spaceflight.[16][35][36] The second CPC series manifested as Commercial Crew Transportation Capability (CCtCap), the final phase of the CCDev program, where NASA would certify an operator to run crewed flights to the ISS through an open competition.[35][36] The window for proposal submissions was closed on 22 January 2014.[35] Sierra Nevada announced a week later that a privately funded orbital test flight of a Dream Chaser spacecraft, using an Atlas V launch vehicle intended to be purchased by Sierra Nevada, was planned to occur on 1 November 2016.[37]
Post-selection
While the first flights of Commercial Crew Program were originally intended to be launched by the end of 2017,[53] Boeing announced in May 2016 that their first crewed flight would be delayed to 2018 due to problems integrating with Starliner's Atlas V N22 launch vehicle.[54][55] In December 2016, SpaceX announced their first crewed flights would also be delayed to 2018,[56][57] following the loss of AMOS-6 in an accidental launch pad explosion of a Falcon 9, the Crew Dragon's launch vehicle.[57][58]
Spacecraft
The Commercial Crew Program uses the SpaceX Crew Dragon to shuttle astronauts to and from the ISS.[39][40][103] The Boeing CST-100 Starliner will join it in this role after it is human-rated.Both spacecraft are automated but can be remotely controlled from the ground or manually controlled by their crew via touch screens in case of an emergency.[104][105] The crew cabins of both spacecraft feature 11 m3 of pressurized volume,[105][106][107] and can be configured to carry up to seven crew each, though NASA will only send up to four crew on each mission in the program; an extension to occupy a fifth seat is available to NASA.[103][108] Both spacecraft are certified to last up to 210 days docked to the ISS.[109][110][111] In addition, the spacecraft were designed to meet NASA's per-mission safety standard of a 1-in-270 chance of catastrophic failure, which is less risky than the 1-in-90 chance of the Space Shuttle.[112]
The spacecraft and the ISS have docking mechanisms that implement the International Docking System Standard (IDSS).[113] The NASA Docking System implementation is used by Starliner and ISS,[114] while Crew Dragon uses a compatible IDSS implementation developed by SpaceX.[113] The IDSS docks are used instead of the Common Berthing Mechanism used by previous Commercial Orbital Transportation Services spacecraft such as the first-generation Dragon.[115]
Crew Dragon
SpaceX's Crew Dragon is a variant of the company's Dragon 2 class of spacecraft, which is an upgraded version of the first-generation Dragon.[116][117] It measures 3.7 m wide, 4.4 m tall without its trunk, and 7.2 m with its trunk.[107][118] While trunks are discarded prior to capsule reentry,[119] crew cabins are designed to be reusable.[119][120]
Missions
NASA originally intended for missions to the ISS to be launched on an average every six months, and they did so for the first eleven missions. Starting with Crew-12, NASA intends to increase mission length to eight months. As part of the original contracts Boeing and SpaceX each were initially contracted for up to six operational flights.[146][147] In 2022, NASA contracted with SpaceX for up to an additional eight flights as a contingency if Starliner is further delayed and to ensure service to the ISS until 2030.[1]
Crew Dragon Missions
SpaceX's Crew-1 mission, the first operational flight in the program, carried Victor Glover, Mike Hopkins, Soichi Noguchi, and Shannon Walker to the ISS in November 2020 aboard Resilience.[148][149][150][151][152] Resilience was originally planned to be used for Crew-2, but was reassigned following a scheduling change resulting from the accidental destruction of C204 during testing.[151] While NASA astronauts were given assignments to either Crew Dragon or Starliner flights, Noguchi – a JAXA astronaut – was open for assignment to whichever spacecraft would launch the first operational mission.[153] With Chris Cassidy having arrived at the ISS during Soyuz MS-16, the arrival of the astronauts aboard Resilience marked the first time since the Space Shuttle program in which the US Orbital Segment of the ISS was completely staffed with four crew.[147][154] Crew-2 launched in April 2021, using a previously-flown Falcon 9 first-stage booster and a refurbished Crew Dragon for the first time.[152][155][156] The mission carried Shane Kimbrough, Megan McArthur, Akihiko Hoshide and Thomas Pesquet aboard Endeavour.[157]Crew-3 launched in November 2021, carrying Thomas Marshburn, Raja Chari, Matthias Maurer and Kayla Barron to the ISS,[158][159] and Crew-4 launched Kjell Lindgren, Bob Hines, Samantha Cristoforetti and Jessica Watkins in April 2022.[160][161][162][163] US astronauts Josh Cassada, Nicole Aunapu Mann and JAXA astronaut Koichi Wakata initially assigned to Starliner crewed flights were reassigned to Crew-5 mission after delays in the Starliner program.[164][165] The fourth astronaut on Crew-5 is filled by a Russian cosmonaut Anna Kikina and thus becoming to be a part of the Soyuz-Dragon crew swap system, that is, keeping at least one NASA astronaut and one Roscosmos cosmonaut on each of the crew rotation missions.That would ensure both countries would have a presence on the station, and ability to maintain their separate systems, if either Soyuz or commercial crew vehicles are grounded for an extended period.[166]
On 3 December 2021, NASA made clear it would secure up to an additional three flights from SpaceX to maintain an uninterrupted U.S. capability for human access to the space station.[167] The background to this was that SpaceX was likely to launch its sixth flight in early 2023 potentially before Boeing's first operational flight,[168] and NASA concluded that only SpaceX had the capability needed.
NASA and Roscosmos agreed to a seat-swapping agreement initially for three flights each, starting with Crew-5 in 2022.A Russian cosmonaut was to fly on one Crew Dragon flight per year while an American astronaut was to fly on one Soyuz flight per year.This arrangement ensures that ISS will have at least one crew member to operate essential services even if one or the other type of spacecraft is grounded.[169] Starting with Crew-5 a cosmonaut has flown on each CCP Dragon flight and a NASA astronaut has flown on each Soyuz flight.The agreement has been extended to 2027.[170]
On 31 August 2022, NASA awarded SpaceX with an additional 5 flights bringing the total number of contracted Crew Dragon flights to 14. The additional flights will run through 2030.[171]
The Crew-8 and Crew-9 missions were both modified in response to the unexpected need to support the crew of the Starliner Boeing Crew Flight Test (CFT), which visited ISS during the Crew-8 mission. Problems with the Starliner caused NASA to extend its mission and ultimately to bring the spacecraft back to Earth without crew. The Crew-8 mission was extended and its Dragon was fitted with two additional makeshift crew seats to allow it to serve as a "lifeboat" for the CFT crew if evacuation had been needed before Crew-9 arrived. Crew-9 was modified to launch with only two crew members and two empty seats. Its launch was delayed for weeks until Starliner was able to undock from ISS and clear the docking port. When Crew-9 arrived at ISS, the crew of CFT became members of the Crew-9 crew and returned on Crew-9 at the end of its mission.[172]
Boeing Starliner Missions
As of, the first operational flight has not been scheduled.[173] The Starliner's inaugural Crewed Flight Test launched on June 5, 2024, had several serious problems including helium leaks during transit, five of the eight reaction control system failing during approach to the ISS, and an RCS oxidizer isolation valve failing to close after docking.Ultimately, NASA decided to re-enter Starliner to Earth without its crew, who instead joined SpaceX Crew-9 when it arrived at ISS in September 2024 and returned with it in March 2025.[174] Due to these problems, Starliner did not receive system certification.[175] NASA continued to evaluate the problems, and in February 2026 announced that the failures constituted a "Type A mishap", the most serious NASA failure classification.[173]
NASA and Boeing agreed to modify their contract, and Starliner-1 will fly as an uncrewed cargo mission. If it is successful, Starliner will fly up to three crewed missions.[176]
Operational CCP missions
Timeline
The CCP spacecraft missions usually overlap with brief intervals during which two are docked at the same time. Crew-2 did not overlap with Crew-3 because of an unexpected delay of the Crew-3 launch. Crew-11 returned before Crew-12 arrival due to a Crew-11 medical issue.
Timeline
The CCP spacecraft missions usually overlap with brief intervals during which two are docked at the same time. Crew-2 did not overlap with Crew-3 because of an unexpected delay of the Crew-3 launch. Crew-11 returned before Crew-12 arrival due to a Crew-11 medical issue.
9.Marshall Space Flight Center. Fact sheet number: FS-2003-05-64-MSFC National Aeronautics and Space Administration, 1 May 2003, retrieved 8 March 2019^
17.{{Harvard citation no brackets|Reichhardt|2018|loc="A pair of privately owned spaceships, Boeing's Starliner and SpaceX's Crew Dragon, are set to make their debut within the next few months [...] ending NASA's post-space-shuttle reliance on the Soyuz to ferry astronauts to and from the International Space Station."}}^
104.{{Harvard citation no brackets|Reichhardt|2018|loc="Although the ships seem like a nod to the past—Apollo-style "capsules" instead of the spaceplanes astronauts rode to orbit for 30 years [...] Both the Starliner and Crew Dragon will travel to the station and dock automatically, with no astronaut input. (The crew can take manual control if something goes wrong.)"}}^
105.{{Harvard citation no brackets|Wall|2018|loc="("CST," by the way, stands for "crew space transportation.") Starliner also features sleek touch-screen displays and has about the same amount of internal volume as the SpaceX capsule."}}^
106.{{Harvard citation no brackets|Howell|2018|loc="The Starliner has a diameter of 15 feet (4.5 meters); a length of 16.5 feet (5 m), which includes the service module; and a volume of about 390 cubic feet (11 cubic md)."}}^
107.{{Harvard citation no brackets|Wall|2018|loc="The gumdrop-shaped cargo Dragon is 14.4 feet tall and 12 feet wide at the base (4.4 by 3.7 meters), with 390 cubic feet (11 cubic meters) of internal volume."}}^
108.{{Harvard citation no brackets|Reichhardt|2018|loc="Seating Capacity: Up to 7 NASA required that each vehicle be able to transport four people to and from the station. A fifth seat is available on both vehicles. Each company advertises a seating capacity of seven."}}^
109.{{Harvard citation no brackets|Howell|2018|loc="Once the Starliner is attached to the space station, it's designed to stay there for 210 days — ample time to allow for the usual crew stays of six months, or 180 days."}}^
112.{{Harvard citation no brackets|Reichhardt|2018|loc="Designers are working to a challenging safety standard: a 1-in-270 chance of a fatal accident, as compared to the 1-in-90 chance calculated for the space shuttle by the time it retired in 2011."}}^
116.{{Harvard citation no brackets|Wall|2018|loc="Crew Dragon is a modified version of its cargo counterpart, and will also launch atop the Falcon 9."}}^
118.{{Harvard citation no brackets|Reichhardt|2018|loc="Diameter: 12.1 ft. Height: 23.6 ft. Dimensions include Dragon's cargo "trunk.""}}^
119.{{Harvard citation no brackets|Wall|2018|loc="Reusable?: Yes, Dragons are reusable, although test flights will fly new vehicles. Cargo trunk is discarded after each flight."}}^
123.McErlean: NASA's plans call for reusing the Falcon 9 booster from the Crew-1 mission on the Crew-2 mission, and to reuse the Demo-2 capsule for Crew-2 as well. 23 July 2020^
126.{{Harvard citation no brackets|Wall|2018|loc="Crew Dragon is also outfitted with an emergency escape system, which consists of eight SuperDraco engines built into the capsule's walls. If something goes wrong at any point during a Crew Dragon flight, these engines can fire up and carry the spacecraft and its passengers to safety."}}^
131.{{Harvard citation no brackets|Wall|2018|loc="It makes parachute-aided splashdowns in the ocean when its work on orbit is done. [...] SpaceX founder and CEO Elon Musk had previously stated that Crew Dragon would eventually be capable of touchdowns on terra firma, using parachutes and retrorocket firings [...] But that option is apparently no longer in the works."}}^
132.{{Harvard citation no brackets|Reichhardt|2018|loc="Landing Site: Atlantic Ocean"}}^
137.{{Harvard citation no brackets|Reichhardt|2018|loc="Head / Leg Room: Diameter: 15 ft. Height: 16.6 ft. Dimensions include service (propulsion) module."}}^
138.{{Harvard citation no brackets|Reichhardt|2018|loc="Reusable?: Yes Crew capsule can be reflown up to 10 times. Service module will be discarded after each flight."}}^
143.{{Harvard citation no brackets|Wall|2018|loc="But Starliner touches down on land, not in the ocean, and therefore also sports impact-cushioning airbags at its rounded base."}}^
144.{{Harvard citation no brackets|Reichhardt|2018|loc="Landing Site: Western U.S. Starliner will parachute to dry land, like Soyuz, and use airbags to cushion the impact. Landing sites at White Sands, NM; Dugway Proving Ground, UT; Edwards AFB, CA; Willcox Playa, AZ."}}^
145.{{Harvard citation no brackets|Howell|2018|loc="If an emergency takes place, though, the spacecraft can splash down in the ocean, just like Apollo and Dragon."}}^
146.{{Harvard citation no brackets|Reichhardt|2018|loc="Each company has contracted for up to six additional taxi flights, during which the Starliner or Crew Dragon will dock with the station, remain attached for six months as a lifeboat for the crew, then return the astronauts to Earth."}}^
168.NASA announces the agency intends to acquire "up to three additional crew flights to the International Space Station" from SpaceX, with the company halfway through its initial 6 flight contract and Boeing's Starliner capsule not yet operational, NASA says it may need to use the additional Crew Dragon flights "as early as 2023," effectively giving an additional buffer for any more Starliner delays. 3 December 2021^
On 16 September 2014, CCtCap concluded with SpaceX's Crew Dragon and Boeing's Starliner being the sole winners, with SpaceX receiving US$2.6 billion contract and Boeing a US$4.2 billion contract.
The GAO declined Sierra Nevada's protest in January 2015, stating that evidence gathered by the GAO discredited Sierra Nevada's claims against NASA; Sierra Nevada accepted the decision.
The company laid off 90 staff members working on the Dream Chaser following the CCtCap result, and repurposed the spacecraft as a for-hire vehicle for commercial spaceflight.
Boeing conducted the Boeing Pad Abort Test in November 2019.[80][81] NASA accepted the test as successful even though one of three parachutes failed to deploy, since the system landed as designed under two parachutes.[82][83] Boeing conducted the Orbital Flight Test in December 2019 and encountered major malfunctions of Starliner's software which precluded an intended docking with the ISS and prompted a truncation of the mission.[84][85][86] The Orbital Flight Test was declared a "high-visibility close call" by NASA following an independent review,[88][91] and a second Orbital Flight Test (Boeing OFT-2) was scheduled for July 2021,[92] with Boeing covering the cost of the flight in lieu of additional CCDev funding.[93][94] Amid further uncertainties about the Commercial Crew Program's progress, NASA purchased a seat on the Soyuz MS-17 mission to ensure participation in Expedition 64 in the event that operational missions in the program are further delayed,[95][96] with the purchase of additional Soyuz seats beyond MS-17 being described as a possibility.[95][96] The SpaceX In-Flight Abort Test was successfully conducted in January 2020,[97][98][99] setting the stage for the final, crewed test flight of Crew Dragon – SpaceX Demo-2 – which launched astronauts Bob Behnken and Doug Hurley to the ISS in May 2020.[99] SpaceX launched its first operational flight, SpaceX Crew-1, on 16 November 2020. It stayed docked to the ISS as planned until 2 May 2021. SpaceX Crew-2 launched on 23 April 2021 and it landed on 9 November 2021, two days before the launch of SpaceX Crew-3. When Boeing OFT-2 was on the pad preparing for launch on 3 August 2021, problems were encountered with 13 valves in the capsule's propulsion system. The launch was scrubbed, and the capsule eventually returned to the factory. Analysis of the problem was still underway in September 2021 and launch was postponed indefinitely. This uncrewed test, Boeing Orbital Flight Test 2, launched on 19 May 2022, and landed successfully on 25 May.[100][101]
On February 28, 2022, NASA announced that it had awarded three additional crew missions to SpaceX bringing the total crew missions for SpaceX to nine and the total contract value to $3,490,872,904.[102] In September 2022, NASA announced yet another addition, this time of five missions, bringing the total to fourteen and the total contract value to $4.93 billion.[1]
After earlier plans of SpaceX to use new capsules for every crewed flight for NASA
Per-mission cost for the first contract extension (missions 7, 8, and 9) is $258.7 million ($64.6 million/seat), and per-mission cost for the second contract extension (missions 10 through 14) is $288 million ($72 million/seat).
Boeing's CST-100 Starliner – "CST" an acronym for "Crew Space Transportation" – measures 4.6 m in diameter and 5.1 m in height.[105][106][137] The crew module of Starliner can be reused for up to ten flights, while the service module is expended during each flight.[114][138] Various engines manufactured by Aerojet Rocketdyne for orbital maneuvering, attitude control, reaction control, and launch escape, are utilized by Starliner.[139] Eight reaction control engines on the spacecraft's crew module and 28 reaction control engines on the spacecraft's service module provide 380 newtons and 445 newtons each, respectively.[140][141] Also located on the service module, 20 custom-made Orbital Maneuvering and Attitude Control (OMAC) engines provide 6700 newtons of thrust each,[139][140][141] while four RS-88 engines provide 178000 newtons of thrust each in a launch abort scenario.[128][139][142] During a nominal flight without a launch abort, Starliner can use unspent fuel reserved for its RS-88 engines to help its OMAC engines perform the orbital insertion burn, following separation from the Centaur upper stage during launch.[140] Once in space, Starliner spacecraft can survive up to 60 hours in free flight.[111] Unlike Crew Dragon, Starliner is designed to return to Earth on land instead of ocean, using airbags to cushion the vehicle's impact with the ground.[143][144] Four sites in the western contiguous United States – the Dugway Proving Ground in Utah, Edwards Air Force Base in California, White Sands Missile Range in New Mexico, and Willcox Playa in Arizona – will serve as landing ranges for returning Starliner spacecraft,[144] though in an emergency scenario, it is also equipped to perform a splashdown return.[145] Boeing's CCtCap contract values each seat on a CST-100 flight to be between US$91–99 million,[133] while the face value of each seat has been estimated by NASA's OIG to be around US$90 million.[134][135][136]
NASA hopes to extend the seat-swapping arrangement with Roscosmos to include Starliner flights after it has enough flights, which will be no earlier than the Starliner-3 flight.[177]