The Cedar Creek Wind Farm is a 551.3 megawatt (MW) wind farm located about 8 miles east of the town of Grover in north-central Weld County, Colorado. It consists of 397 wind turbines and was constructed in two phases, Cedar Creek I and Cedar Creek II, becoming fully operational in 2010. The electricity is sold to the Public Service Company of Colorado.
Details
The initial 300.5 MW Cedar Creek I installation was completed on time, within budget, and without incident - with the operation commencing on 21 November 2007. Cedar Creek I is an important contributor to Colorado's New Energy Economy, providing enough wind-powered electricity for 81,135 homes.[1] Cedar Creek II has an additional 250.8 MW of generating capacity, and was commissioned in 2010.
The first phase has 221 1 MW wind turbines from Mitsubishi Heavy Industries and 53 1.5 MW turbines from General Electric.[2] The second phase has an additional 63 1.6 MW SLE turbines from General Electric, and 60 2.5 MW from German wind turbine supplier Nordex